• Twitter
  • LinkedIn
  • Facebook
  • ABOUT US
  • WORK FOR US
  • HSEQ
  • NEWS
Tel: 02380 675888 | Email: hello@broadsword-group.co.uk
Broadsword Group
  • PROJECTS
  • RESIDENTIAL
  • SCREEDING
  • INTERIOR FIT OUT
  • FIRE PROTECTION
  • OTHER SERVICES
    • DRY LINING
    • SUSPENDED CEILINGS
    • SOLID PARTITIONING
    • RENDERING
    • SECONDARY FRAMING SYSTEM
    • ACOUSTIC SOLUTIONS
    • GLAZED PARTITIONING
    • PLASTERING
    • FIRESTOPPING AND AIR SEALING
    • SECOND FIX CARPENTRY
    • ALL FLOOR COVERINGS
    • RAISED ACCESS FLOORING
  • CASE STUDIES
    • BOW SQUARE
    • OAKLEY HALL
    • PORTSEBURY SEN SCHOOL
    • THE BROOK CLUB
    • SPLASHPOINT LEISURE CENTRE
    • FOREST EDUCATION CENTRE
    • SANDPIPER WALK
    • BISHOPS OTTER CAMPUS
    • HINCHLEY WOOD SCHOOL
    • CEMAST
    • SCHOLARS GRANGE
    • SILVER SANDS COURT
    • BROADSWORD HEAD OFFICE
    • CONFIDENTIAL DATA CENTRE
    • BULMERSHE SCHOOL
  • GET IN TOUCH
  • Menu
FIRAS

We are FIRAS registered

October 11, 2017/0 Comments/in Accreditation, News /by joannevickers

As part of our ongoing expansion, and to offer as many services as possible, we have recently become FIRAS registered.  

As a requirement of the FIRAS Schemes, certificated companies are required to employ, on a permanent or contract basis, competent Supervisors and Technicians (Operators) whose technical and practical competence is assessed by FIRAS Inspectors in the trade disciplines for which certification scope is held. A register of competent employees is maintained for each certificated company, which is regularly reviewed to ensure that the company maintains a competent workforce whose abilities remain current with the workscope the company provides.

Once certificated, all FIRAS Registered Installer Companies are subject to ongoing random inspection of their installation work on ongoing contracts along with an annual audit of their office systems by FIRAS Inspectors to ensure that compliance with FIRAS Scheme Requirements is maintained.

FIRAS are a voluntary, third party certification for installation contractors of both passive and active fire protection systems, operated by Warrington Certification, and accredited by UKAS to EN45011.

FIRAS certification started in 1994 and has been instrumental in improving standards of installation of fire protection products/systems to the benefit of the construction industry and the clients it serves.

Why choose a FIRAS certificated installation contractor?

FIRAS certificated contractors are required to undergo a 3 stage assessment process. Only when the applicant contractor has satisfied all of the following criteria is certification granted:

• Assessment of office management systems.

• Assessment of workmanship of site for all trade disciplines for which certification is sought.

• Competence assessment of supervisory and installation employees.

If the job is not installed to Firas standards by the sub contractor (MGN Fire Protection), then FIRAS cannot issue certification until the works are up to the above criteria.

FIRAS certification is awarded to the contracting company not the staff. Should a contractor wish to increase their scope of certification, a separate application must be made to attain the additional certification.

All FIRAS site inspectors have technical and practical knowledge and experience in fire protection.

FIRAS certificated contractors are subject to an annual audit of their offices and ongoing, random surveillance site inspections where competence and workmanship are assessed.

FIRAS inspectors conduct additional inspections of the work carried out by the certificated contractor on request to satisfy client’s needs.

We at present can offer penetration sealing services – techniques that will minimise the effect a fire has on the fabric of a building.

This must look at dividing a building into compartments that can be closed to stop the spread of fire – this is known as compartmentation. Confining a fire to its point of origin is the key objective of any fire safety measure..

Compartments with fire-separating elements, on the other hand, can confine a fire to its area of origin so it is essential to maintain integrity where services breach fire resting walls in such areas as:-

• multi-service openings through walls and floors

• blank service openings through walls and floors

• combustible pipes (plastics)

• cavity barriers

• construction joints

• any imperfection of fit to a fire-rated building element

Proprietary penetration seal/service opening fire protection systems include boards, batts, mortars, sealants, collars, wraps, pillows, curtains and linear joints. Penetration seal systems are available for up to 4 hours integrity and, in some cases, insulation against a cellulosic fire, in accordance with national and European standards. Products are also available to protect against hydrocarbon fires.

•Source FIRAS / EAPFP

Tags: FIRAS, Health & Safety
Share this entry
  • Share on Facebook
  • Share on Twitter
  • Share on WhatsApp
  • Share on Pinterest
  • Share on LinkedIn
  • Share by Mail
https://broadsword-group.co.uk/wp-content/uploads/2017/04/BS_Blog_header_1030x433_FIRAS.jpg 433 1030 joannevickers https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png joannevickers2017-10-11 09:06:142017-10-11 09:06:14We are FIRAS registered
You might also like
FIRAS Broadsword to become FIRAS accredited
H&S Vacancy2 VACANCY: Health & Safety Co-ordinator
FIRAS Broadsword FIRAS accreditation complete
construction inspection A sharp decline in construction inspections isn't good news
FIRAS Broadsword launch Fire Protection Arm
0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply Cancel reply

You must be logged in to post a comment.

Recent Posts

  • 3D Printing in Construction: Revolutionising the Industry
  • Sustainable Fire Protection: Eco-Friendly Solutions for Green Buildings
  • How Technology is Shaping the Future of Construction
  • Top Fire Protection Trends in Commercial Construction for 2025
  • Emerging Trends in Construction 2025

Recent Comments

    Archives

    • April 2025
    • March 2025
    • February 2025
    • January 2025
    • December 2024
    • November 2024
    • October 2024
    • September 2024
    • August 2024
    • July 2024
    • June 2024
    • May 2024
    • April 2024
    • March 2024
    • February 2024
    • January 2024
    • December 2023
    • November 2023
    • October 2023
    • September 2023
    • August 2023
    • July 2023
    • May 2023
    • April 2023
    • March 2023
    • February 2023
    • January 2023
    • December 2022
    • November 2022
    • October 2022
    • September 2022
    • August 2022
    • July 2022
    • June 2022
    • May 2022
    • April 2022
    • March 2022
    • February 2022
    • January 2022
    • December 2021
    • November 2021
    • October 2021
    • September 2021
    • August 2021
    • July 2021
    • June 2021
    • May 2021
    • April 2021
    • March 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • July 2020
    • June 2020
    • May 2020
    • April 2020
    • March 2020
    • February 2020
    • January 2020
    • December 2019
    • October 2019
    • September 2019
    • August 2019
    • July 2019
    • June 2019
    • May 2019
    • April 2019
    • March 2019
    • February 2019
    • January 2019
    • December 2018
    • November 2018
    • October 2018
    • September 2018
    • August 2018
    • July 2018
    • June 2018
    • May 2018
    • April 2018
    • March 2018
    • February 2018
    • January 2018
    • December 2017
    • November 2017
    • October 2017
    • September 2017
    • August 2017
    • July 2017
    • June 2017
    • May 2017
    • April 2017
    • June 2016
    • April 2016
    • March 2016

    Categories

    • Accreditation
    • Charity Events
    • Commercial
    • Fire Protection
    • Home Page news feed
    • Interiors Fit Outs
    • News
    • Other
    • Projects
    • Residential
    • Screeding
    • technology
    • Vacancies

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org
    02380 675888
    hello@broadsword-group.co.uk
    SEE WHAT WE CAN DO FOR YOUR BUSINESS
    • 3d printing3D Printing in Construction: Revolutionising the IndustryApril 28, 2025 - 10:52 am

      The construction industry is on the brink of a revolution, and 3D printing is leading the charge. This groundbreaking technology is transforming how structures are designed, built, and even maintained, offering unprecedented opportunities for innovation and efficiency. Here’s how it is reshaping the construction landscape and what it means for the future of the industry. […]

      READ MORE
    • sustainable fire protectionSustainable Fire Protection: Eco-Friendly Solutions for Green BuildingsMarch 24, 2025 - 10:49 am

      In the modern era of construction, sustainability is no longer a luxury—it’s a necessity. As the push for eco-friendly and green building practices gains momentum, fire protection systems must also evolve to align with these goals. Balancing safety with sustainability is essential for creating structures that are both secure and environmentally responsible. Here’s how sustainable […]

      READ MORE

    © Broadsword Group Ltd 2024 – website by Zap Terms of Service | Privacy Policy | Sitemap |

    logo strip
    New Solar roof tiles to be launched solecco solar new homes New home permissions hit the highest on record
    Scroll to top