• Twitter
  • LinkedIn
  • Facebook
  • ABOUT US
  • WORK FOR US
  • HSEQ
  • NEWS
Tel: 02380 675888 | Email: [email protected]
Broadsword Group
  • PROJECTS
  • RESIDENTIAL
  • SCREEDING
  • INTERIOR FIT OUT
  • FIRE PROTECTION
  • OTHER SERVICES
    • DRY LINING
    • SUSPENDED CEILINGS
    • SOLID PARTITIONING
    • RENDERING
    • SECONDARY FRAMING SYSTEM
    • ACOUSTIC SOLUTIONS
    • GLAZED PARTITIONING
    • PLASTERING
    • FIRESTOPPING AND AIR SEALING
    • SECOND FIX CARPENTRY
    • ALL FLOOR COVERINGS
    • RAISED ACCESS FLOORING
  • CASE STUDIES
    • BOW SQUARE
    • OAKLEY HALL
    • PORTSEBURY SEN SCHOOL
    • THE BROOK CLUB
    • SPLASHPOINT LEISURE CENTRE
    • FOREST EDUCATION CENTRE
    • SANDPIPER WALK
    • BISHOPS OTTER CAMPUS
    • HINCHLEY WOOD SCHOOL
    • CEMAST
    • SCHOLARS GRANGE
    • SILVER SANDS COURT
    • BROADSWORD HEAD OFFICE
    • CONFIDENTIAL DATA CENTRE
    • BULMERSHE SCHOOL
  • GET IN TOUCH
  • Menu
timber

What does a ban on timber cladding for high rise buildings mean?

February 6, 2019/0 Comments/in Home Page news feed, News /by joannevickers

The government is banning combustible materials on new high-rise homes and giving support to local authorities to carry out emergency work to remove and replace unsafe aluminium composite material (ACM) cladding.

Regulations have been laid in Parliament which will give legal effect to the combustible materials ban announced in the summer. The ban means combustible materials will not be permitted on the external walls of new buildings over 18 metres containing flats, as well as new hospitals, residential care premises, dormitories in boarding schools and student accommodation over 18 metres.

Schools over 18 metres which are built as part of the government’s centrally delivered build programmes will also not use combustible materials, in line with the terms of the ban, in the external wall.

The Communities Secretary is also taking action to speed up the replacement of unsafe ACM cladding, like the type used on Grenfell Tower.

Local authorities will get the government’s full backing, including financial support if necessary, to enable them to carry out emergency work on affected private residential buildings with unsafe ACM cladding. They will recover the costs from building owners. This will allow buildings to be made permanently safe without delay.

The government is already fully funding the replacement of unsafe ACMcladding on social sector buildings above 18 metres.

Secretary of State for Communities, Rt Hon James Brokenshire MP said:

Everyone has a right to feel safe in their homes and I have repeatedly made clear that building owners and developers must replace dangerous ACMcladding. And the costs must not be passed on to leaseholders.

My message is clear – private building owners must pay for this work now or they should expect to pay more later.

So what does this mean for Timber?

The past five years has seen engineered timber take hold in the UK where, thanks in part to falling prices and the rise of the sustainability agenda, it has been used to deliver over 500 buildings to date.

A proven solution for low and medium-rise residential buildings and schools, CLT is now being applied to swimming pools, gymnasiums, light industrial buildings and office blocks.

Innovative new products and design methods have allowed timber to compete structurally at scale with concrete or steel, which among other things has resulted in development of the world’s first nine-storey timber residential building, Murray Grove in the London Borough of Hackney, and the world’s largest cross-laminated timber (CLT) building, in terms of volume of wood, Dalston Works in east London.

Constructing with timber, versus traditional materials with high embodied carbon, helps cut emissions and may be critical to keep global warming below 1.5 deg C, needed to prevent the worst effects of climate change. CLT, which is relatively light and quick to erect, has even been held up as a potential solution to the housing crisis.

Its use by Sky, on the Believe in Better building – the tallest commercial timber building in the UK – and more recently Google, for the new European HQ currently on site at King’s Cross, are evidence of CLT’s increasing popularity. Key benefits include rapid installation, reduced waste, lighter weight compared to concrete, meaning fewer foundations, and much lower embodied carbon.

Innovations are driving the development of new engineered timber products and design methods. Hybrid structures that use CLT in combination with glulam, laminated veneer lumber (LVL) or steel beams make it possible to achieve the bigger spans required for commercial offices and industrial buildings. For example, the recently completed factory headquarters for Vitsoe in Royal Leamington Spa, Warwickshire, was able to achieve 25m column-free spans using a newly developed beech LVL.

New parametric modelling systems are also making it possible to develop panels that are bespoke to specific purposes using different types and thicknesses of timber and different laminates.

Adrian Campbell, director at engineering consultant Changebuilding, says: “There is a tremendous drive for offsite right now, fuelled by the digitisation of the industry, and a significant number of timber modular systems appearing, including volumetric CLT systems by Swan Housing. There are numerous ways engineered timber can be used to supplement or replace traditional building elements.”

The Grenfell tragedy sent out shockwaves that will be felt for many years to come. Where previously, insurance to construct tall buildings was relatively straightforward, albeit with slightly fluctuating premiums, post-Grenfell they have increased significantly. And although much of the media focus was on the tower’s cladding, a knock-on effect has been that insurers today perceive any tall building as an insurance risk.

“In the past the industry took it for granted that you could get insurance to build things, but the market is becoming tighter and tighter – it’s a rapidly changing landscape we have to operate in,” says Tim Carey, national product director at Willmott Dixon. “Certain products and systems that were previously acceptable, including engineered timber, are now very difficult to get insurance on. I wouldn’t be surprised if we start to see exclusion clauses relating to CLT appearing in insurance documents.”

He is part of an early adopters group set up by the Ministry of Housing, Communities and Local Government (MHCLG) to trial ways of working in line with the recommendations of the Hackitt Review.

According to Carey, things came to a head recently when the main contractor was unable to get insurance cover to build a circa 15-storey tower block out of CLT. The material was a requirement for the customer’s architect so Willmott Dixon was forced to decline the opportunity.

This prompted it to develop a new set of internal policies for fire safety and compliance to help futureproof the business and its customers and projects in the shorter term. In a move that pre-empted the latest government ruling, the company banned the use of any combustible materials in external wall build-ups, including structural elements, cladding and insulation, for any buildings over 18m tall.

“This is about taking a pragmatic position on what we think is reasonable. Our view is that in the wider industry, too many buildings are being built with inappropriate materials without sufficient duty of care or auditing to know what goes into a building to make it safe,” says Carey.

The decision by government to impose its own ban on combustibles was welcomed by many, but strongly criticised by architects, manufacturers and others working with CLT (currently the only viable structural timber solution for high-rise) who believe its inclusion within the regulation was arbitrary and unjustified.

The law applies to all new housing, student accommodation, registered care homes, hospitals and boarding school dormitories over 18m tall and states that only materials with European fire rating of Class A1 or A2 may be used in external walls, which excludes all wood products.

Some critics pointed to the fact that Grenfell was a concrete-framed tower and the spread of the flames is thought to have been accelerated by combustible aluminium-composite cladding, not by wood.

Also notable is the fact that the final Hackitt report itself does not recommend a ban; instead it states that too much focus has been placed on the faults of the Grenfell cladding rather than on reviewing the system as a whole.

One of its eight key recommendations is to develop a clearer, more transparent and more effective specification and testing regime of construction products, including products as they are put together as part of a system. It states that this should include clear statements on what systems products can and cannot be used for, with their use made essential.

Mark Stevenson, chairman of the Structural Timber Association, says: “Given the way that clients are looking at their buildings and wanting to better understand performance and how things get delivered, we need to be looking at overall systems. This isn’t about individual products, it is more about how they come together to provide safety for occupants.

You could imagine a situation where a collection of non-combustible materials still act like a chimney to spread fire, so wouldn’t it be better to design a system that prevents something like that from happening?”

Connecting timber with elevated fire risk might seem like common sense, but one of the major advantages of CLT is its inherent fire resistance. As a panelised system with a thick cross-section, it is designed to char slowly and maintain its structural integrity.

In addition, the emphasis on upfront design and offsite manufacture makes it possible to create super-airtight spaces that prevent the spread of fire. In practice, a combination of timber charring and fire-resistant boards are commonly used to achieve the fire rating.

However, CLT remains a relatively new material with limited in-use fire testing, and codes are still being adapted to accommodate it.

Given the global drive to build increasingly taller “ply-scrapers” (see below), there are concerns that the recent ban will compromise Britain’s position at the forefront of innovation in engineered timber.

The ban is likely to result in changes to specifications and approaches but is unlikely to prevent the general use of engineered timber frames. The reality could be some form of hybrid structural solution, which may have an impact on sequencing, speed of delivery and the amount of onsite labour.

Architect Waugh Thistleton, a prominent CLT advocate, is amending design proposals to take into account the need for some form of steel frame system for external walls, alongside internal CLT floor slabs, walls, core and stairs.

“It’s not the best way to build; part of the advantage of building in CLT is that the frame for each floor goes up simultaneously and from a single source of delivery, which ensures that the site is fully accessible and safe for use by follow-on trades on every floor below the one being built,” says founding partner Anthony Thistleton.

“We expect the speed of CLT erection to be compromised by this regulation in the short term. We are currently working to see if we can tie up with manufacturers of offsite panel systems so we can synchronise installation with CLT.”

Meanwhile, the CLT Hub, a collection of all key UK stakeholders, continues to lobby the government and local authorities to overturn the ban. Evidence from global fire performance testing is being compiled to present the case.

Connecting timber with elevated fire risk might seem like common sense, but one of the major advantages of CLT is its inherent fire resistance. As a panelised system with a thick cross-section, it is designed to char slowly and maintain its structural integrity.

In addition, the emphasis on upfront design and offsite manufacture makes it possible to create super-airtight spaces that prevent the spread of fire. In practice, a combination of timber charring and fire-resistant boards are commonly used to achieve the fire rating.

However, CLT remains a relatively new material with limited in-use fire testing, and codes are still being adapted to accommodate it.

Given the global drive to build increasingly taller “ply-scrapers” (see below), there are concerns that the recent ban will compromise Britain’s position at the forefront of innovation in engineered timber.

The ban is likely to result in changes to specifications and approaches but is unlikely to prevent the general use of engineered timber frames. The reality could be some form of hybrid structural solution, which may have an impact on sequencing, speed of delivery and the amount of onsite labour.

Architect Waugh Thistleton, a prominent CLT advocate, is amending design proposals to take into account the need for some form of steel frame system for external walls, alongside internal CLT floor slabs, walls, core and stairs.

“It’s not the best way to build; part of the advantage of building in CLT is that the frame for each floor goes up simultaneously and from a single source of delivery, which ensures that the site is fully accessible and safe for use by follow-on trades on every floor below the one being built,” says founding partner Anthony Thistleton.

“We expect the speed of CLT erection to be compromised by this regulation in the short term. We are currently working to see if we can tie up with manufacturers of offsite panel systems so we can synchronise installation with CLT.”

Meanwhile, the CLT Hub, a collection of all key UK stakeholders, continues to lobby the government and local authorities to overturn the ban. Evidence from global fire performance testing is being compiled to present the case.

Whatever the ultimate outcome, its proponents argue engineered timber remains one of the quickest and most sustainable methods of construction and believe the current situation may constitute a bump in the road.

“We often draw a parallel with the growth of concrete and reinforced concrete in the 20th century. When you look at the trajectory of innovation and architecture that emerged in the concrete age, we are only just at the beginning of the timber age and there is still a huge amount to achieve,” Thistleton concludes.

Whatever the ultimate outcome, its proponents argue engineered timber remains one of the quickest and most sustainable methods of construction and believe the current situation may constitute a bump in the road.

“We often draw a parallel with the growth of concrete and reinforced concrete in the 20th century. When you look at the trajectory of innovation and architecture that emerged in the concrete age, we are only just at the beginning of the timber age and there is still a huge amount to achieve,” Thistleton concludes.

Away from the UK, the rest of the world continues to build higher and higher with timber.

Last month, the US-based International Code Council (ICC) gave the go-ahead for 14 tall mass timber code change proposals that will allow mass timber buildings to reach up to 18 storeys. The changes will be included in the 2021 International Building Code.

The world’s highest mass timber tower, at 53m, is currently the 18-storey high Brock Commons in Vancouver, which is supported on a timber frame but enclosed by a skin of drywall and concrete.

Australia’s tallest timber building is a 45m-high office in Brisbane, which uses an offsite manufactured structure of glulam and cross-laminated timber (CLT). It was completed last year after a build of just 15 months.

The 10-storey building, known as 25 King, was designed by architect Bates Smart for Lendlease.

Meanwhile, the world’s tallest timber tower is under construction in the Norwegian town of Brumunddal: the Mjøstårnet tower at 80m high will dwarf its closest rival by 27m.

The 18-storey structure is based around a perimeter frame of glulam columns, beams and diagonals that brace the external walls and carry vertical and horizontal loads.

A CLT core holds three elevators and two staircases. There are about 400 giant glulam elements in total, the biggest of which has a cross section of 1.5m x 0.6m.

The Mjøstårnet tower is due to open next month.

Sources: gov.uk  / Construction Magazine

Tags: Cladding, Fire cladding, Timber
Share this entry
  • Share on Facebook
  • Share on Twitter
  • Share on WhatsApp
  • Share on Pinterest
  • Share on LinkedIn
  • Share by Mail
https://broadsword-group.co.uk/wp-content/uploads/2019/02/rsz_1tree-trunks-timber-timber-industry-da45d9-1024.jpg 433 1024 joannevickers https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png joannevickers2019-02-06 11:19:072019-02-12 11:25:41What does a ban on timber cladding for high rise buildings mean?
You might also like
cladding Combustible cladding could be banned in the wake of Glenfell
fire New alliance formed to improve facade fire-testing
cladding Flammable cladding is a breach of human rights
fire Fire regulatory system is 'broken'
Cladding Combustible cladding over 18m to be banned
cladding Government urged to consider the environmental cost to timber over the new ban on combustible cladding
0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • Types of Suspended Ceilings
  • Air Sealing in Buildings
  • New duties under Fire Safety (England) Regulations 2022
  • Construction site fire safety regulations: Who’s responsible?
  • Construction sites: fire safety

Recent Comments

    Archives

    • July 2022
    • June 2022
    • May 2022
    • April 2022
    • March 2022
    • February 2022
    • January 2022
    • December 2021
    • November 2021
    • October 2021
    • September 2021
    • August 2021
    • July 2021
    • June 2021
    • May 2021
    • April 2021
    • March 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • July 2020
    • June 2020
    • May 2020
    • April 2020
    • March 2020
    • February 2020
    • January 2020
    • December 2019
    • October 2019
    • September 2019
    • August 2019
    • July 2019
    • June 2019
    • May 2019
    • April 2019
    • March 2019
    • February 2019
    • January 2019
    • December 2018
    • November 2018
    • October 2018
    • September 2018
    • August 2018
    • July 2018
    • June 2018
    • May 2018
    • April 2018
    • March 2018
    • February 2018
    • January 2018
    • December 2017
    • November 2017
    • October 2017
    • September 2017
    • August 2017
    • July 2017
    • June 2017
    • May 2017
    • April 2017
    • June 2016
    • April 2016
    • March 2016

    Categories

    • Accreditation
    • Charity Events
    • Commercial
    • Fire Protection
    • Home Page news feed
    • Interiors Fit Outs
    • News
    • Other
    • Projects
    • Residential
    • Screeding
    • Vacancies

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org
    02380 675888
    [email protected]
    SEE WHAT WE CAN DO FOR YOUR BUSINESS
    • suspended ceilingTypes of Suspended CeilingsJuly 20, 2022 - 3:24 pm

      Suspended ceilings can be described as a secondary ceiling that is suspended from a structural floor slab above producing a space between the top of the suspended ceiling and the bottom of the floor slab. These ceilings can be incredibly useful as valuable space can be offered for building supplies that would be exposed otherwise. […]

      READ MORE
    • air sealingAir Sealing in BuildingsJune 15, 2022 - 12:28 pm

      Air sealing is an effective way to help prevent fires from spreading. Buildings with air leakage can mean that a fire can spread dangerously fast as the air fans the flames of the fire. This can also seriously effect energy efficiency. Air leakage can occur when outside air enters the building and conditioned air leaves […]

      READ MORE

    © Broadsword Group Ltd 2017 – website by Zap Terms of Service | Privacy Policy | Sitemap |

    accreditation logos
    The cheapest form of UK energy could soon be offshore wind wind turbines Housing House-building boosts construction activity
    Scroll to top