• Link to X
  • Link to LinkedIn
  • Link to Facebook
  • ABOUT US
  • WORK FOR US
  • HSEQ
  • NEWS
Tel: 02380 675888 | Email: hello@broadsword-group.co.uk
Broadsword Group
  • PROJECTS
  • RESIDENTIAL
  • SCREEDING
  • INTERIOR FIT OUT
  • FIRE PROTECTION
  • OTHER SERVICES
    • DRY LINING
    • SUSPENDED CEILINGS
    • SOLID PARTITIONING
    • RENDERING
    • SECONDARY FRAMING SYSTEM
    • ACOUSTIC SOLUTIONS
    • GLAZED PARTITIONING
    • PLASTERING
    • FIRESTOPPING AND AIR SEALING
    • SECOND FIX CARPENTRY
    • ALL FLOOR COVERINGS
    • RAISED ACCESS FLOORING
  • CASE STUDIES
    • BOW SQUARE
    • OAKLEY HALL
    • PORTSEBURY SEN SCHOOL
    • THE BROOK CLUB
    • SPLASHPOINT LEISURE CENTRE
    • FOREST EDUCATION CENTRE
    • SANDPIPER WALK
    • BISHOPS OTTER CAMPUS
    • HINCHLEY WOOD SCHOOL
    • CEMAST
    • SCHOLARS GRANGE
    • SILVER SANDS COURT
    • BROADSWORD HEAD OFFICE
    • CONFIDENTIAL DATA CENTRE
    • BULMERSHE SCHOOL
  • GET IN TOUCH
  • Menu Menu
Cladding

Combustible cladding over 18m to be banned

October 3, 2018/in Home Page news feed, News

The Government has confirmed it is banning the use of all combustible cladding on new residential buildings over 18m.

New building regulations will be introduced for external wall systems banning plastics, wood and other products that include combustible materials found in some aluminium composite panel systems.

Materials that would be allowed are those classed as A1 or A2 under the European Classification system.

Hotels and office building would be exempt because they have different evacuation strategies and the risks are lower.

Full details of the proposed ban have yet to be released. It is still not known whether the ban would apply to any material in wall construction from the internal face of the wall through to its external face, as first proposed.

If this proved the case internal wallpaper and paint, window frames, gaskets and seals, vapour membranes, surface finishes and laminated glass would likely be exempted.

To comply with the stricter requirements, it is estimated that for a 15-storey new build requiring 1,700m2 of cladding, a wall system which comprises only materials of A2 will cost an extra £25,000-£75,000.

Across England, this would equate to an expected overall annual cost of £7.5m-£11m assuming average build rates, according to the Government.

The Communities Secretary James Brokenshire confirmed the decision at the Conservative Party Conference.

“I can confirm that I will change the building regulations to ban the use of combustible materials for all new high rise residential buildings, hospitals, registered care homes and student accommodation.

“And bring about a change in culture on building safety.”

The new ban will be implemented through changes to building regulations to be brought forward in late autumn.

The plan to tighten up on materials use on building exteriors came as the Government also issued a further warning that even small amounts of combustible ACM cladding fitted to existing buildings must be removed.

Fresh guidance from the Government’s expert panel revealed that some experts were mistakenly advising building owners that combustible ACM cladding could remain on high rise buildings when fitted to small parts or strips of the building envelope.

The guidance says: “We have become aware that some building owners have received advice that indicates that it is acceptable to leave small or partial amounts of ACM cladding on their buildings.

“Given the risk of fire spread posed by ACM cladding systems, the independent expert advisory panel’s view is that leaving any amount of ACM cladding on a building would continue to pose a hazard to both residents and firefighters in the event of a fire.

“The clearest way to ensure the safety of residents is to remove all ACM, including small or partial areas of ACM, and replace it with a safe material. This remains the most appropriate remediation solution.”

However, the Fire Brigades Union (FBU) said the new regulations did not go far enough, claiming the move was “designed for political convenience”.

Class A2 materials such as plasterboard, which has limited combustibility, will continue to be permitted under the new rules.

Firefighters are calling for only A1 materials, which do not contribute to a fire at any stage – such as metal, stone and glass – be allowed.

The partial ban on combustible cladding will not be applied retrospectively to buildings that have already had the panels fitted.

FBU general secretary Matt Wrack said: “These measures do not deal with the existing cladding on nearly 500 buildings across England where people live and work every day.

“The government’s proposals only apply to buildings over 18 metres high, plus hospitals, care homes and student accommodation, when they should apply to all buildings, whatever their height or use.

“They continue to allow A2 materials, when they should permit only the highest standard of A1.”

Mr Wrack added: “This announcement is designed for political convenience, not for thoroughgoing change. The failings in the fire safety regime are far wider than just the materials used. The whole deregulated system and weak guidance needs to be overhauled.

“Many residents of high rise residential buildings and firefighters wanted more comprehensive action taken against flammable cladding. This government has failed to deliver.”

A spokesman for Mr Brokenshire said: “We are saddened to see the response of the Fire Brigades Union. We consulted on this very important matter and indeed went beyond what was asked of us.

“These measures will save lives, and we are clear building safety is at the very heart of what Mr Brokenshire is doing.”

Source: Construction Enquirer / The Independent

Tags: Cladding, Combustible, Fire
Share this entry
  • Share on Facebook
  • Share on X
  • Share on WhatsApp
  • Share on Pinterest
  • Share on LinkedIn
  • Share by Mail
https://broadsword-group.co.uk/wp-content/uploads/2018/10/rsz_cladding.jpg 433 1030 joannevickers https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png joannevickers2018-10-03 09:29:442018-10-10 11:13:10Combustible cladding over 18m to be banned
You might also like
cladding Combustible cladding could be banned in the wake of Glenfell
fire New alliance formed to improve facade fire-testing
cladding Flammable cladding is a breach of human rights
fire Fire regulatory system is ‘broken’
dame judith Construction standards shocking, according to Dame Judith Hackitt
fire Fire safety in construction a bigger priority post Grenfell
cladding Government urged to consider the environmental cost to timber over the new ban on combustible cladding
timber What does a ban on timber cladding for high rise buildings mean?
0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply Cancel reply

You must be logged in to post a comment.

Search Search

Recent Posts

  • Why the Most Sustainable Building May Be the One Already Standing
  • Why Early Coordination Between Trades Prevents Costly Fit-Out Delays
  • Why Acoustic Performance Is Becoming Essential in Modern Commercial Interiors
  • Building Through the Heat: How Construction Projects Can Prepare for British Heatwaves
  • How the Right Render System Supports Building Performance and Appearance

Recent Comments

    Archives

    • September 2026
    • August 2026
    • July 2026
    • June 2026
    • May 2026
    • April 2026
    • March 2026
    • February 2026
    • January 2026
    • December 2025
    • November 2025
    • October 2025
    • September 2025
    • August 2025
    • July 2025
    • June 2025
    • May 2025
    • April 2025
    • March 2025
    • February 2025
    • January 2025
    • December 2024
    • November 2024
    • October 2024
    • September 2024
    • August 2024
    • July 2024
    • June 2024
    • May 2024
    • April 2024
    • March 2024
    • February 2024
    • January 2024
    • December 2023
    • November 2023
    • October 2023
    • September 2023
    • August 2023
    • July 2023
    • May 2023
    • April 2023
    • March 2023
    • February 2023
    • January 2023
    • December 2022
    • November 2022
    • October 2022
    • September 2022
    • August 2022
    • July 2022
    • June 2022
    • May 2022
    • April 2022
    • March 2022
    • February 2022
    • January 2022
    • December 2021
    • November 2021
    • October 2021
    • September 2021
    • August 2021
    • July 2021
    • June 2021
    • May 2021
    • April 2021
    • March 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • July 2020
    • June 2020
    • May 2020
    • April 2020
    • March 2020
    • February 2020
    • January 2020
    • December 2019
    • October 2019
    • September 2019
    • August 2019
    • July 2019
    • June 2019
    • May 2019
    • April 2019
    • March 2019
    • February 2019
    • January 2019
    • December 2018
    • November 2018
    • October 2018
    • September 2018
    • August 2018
    • July 2018
    • June 2018
    • May 2018
    • April 2018
    • March 2018
    • February 2018
    • January 2018
    • December 2017
    • November 2017
    • October 2017
    • September 2017
    • August 2017
    • July 2017
    • June 2017
    • May 2017
    • April 2017
    • June 2016
    • April 2016
    • March 2016

    Categories

    • Accreditation
    • Charity Events
    • Commercial
    • Fire Protection
    • Home Page news feed
    • Interiors Fit Outs
    • News
    • Other
    • Projects
    • Residential
    • Screeding
    • technology
    • Vacancies

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org

    Why the Most Sustainable Building May Be the One Already Standing

    The construction industry is under growing pressure to reduce…
    September 11, 2026/by Luke Mostran

    Why Early Coordination Between Trades Prevents Costly Fit-Out Delays

    A commercial fit-out rarely fails because of one single mistake.…
    August 27, 2026/by Luke Mostran

    Why Acoustic Performance Is Becoming Essential in Modern Commercial Interiors

    Modern commercial interiors are expected to support several activities…
    July 15, 2026/by Luke Mostran

    Building Through the Heat: How Construction Projects Can Prepare for British Heatwaves

    Hot weather is not always the first thing people associate with…
    June 12, 2026/by Luke Mostran

    How the Right Render System Supports Building Performance and Appearance

    Rendering is often seen as the final touch on a building’s…
    May 14, 2026/by Luke Mostran

    Why Fire Protection Should Be Considered Early in Commercial Building Projects

    Fire protection is one of those areas that can cause major issues…
    April 16, 2026/by Luke Mostran

       02380 675888

      hello@broadsword-group.co.uk

    SEE WHAT WE CAN DO FOR YOUR BUSINESS

    © Broadsword Group Ltd 2025 – website by Zap

    Terms of Service   |   Privacy Policy   |   Sitemap

        

    logo strip
    Link to: Fire regulatory system is ‘broken’ Link to: Fire regulatory system is ‘broken’ Fire regulatory system is ‘broken’fire Link to: Government will lift the borrowing cap on councils to allow them to build many more homes Link to: Government will lift the borrowing cap on councils to allow them to build many more homes august figuresGovernment will lift the borrowing cap on councils to allow them to build many...
    Scroll to top Scroll to top Scroll to top