• Twitter
  • LinkedIn
  • Facebook
  • ABOUT US
  • WORK FOR US
  • HSEQ
  • NEWS
Tel: 02380 675888 | Email: hello@broadsword-group.co.uk
Broadsword Group
  • PROJECTS
  • RESIDENTIAL
  • SCREEDING
  • INTERIOR FIT OUT
  • FIRE PROTECTION
  • OTHER SERVICES
    • DRY LINING
    • SUSPENDED CEILINGS
    • SOLID PARTITIONING
    • RENDERING
    • SECONDARY FRAMING SYSTEM
    • ACOUSTIC SOLUTIONS
    • GLAZED PARTITIONING
    • PLASTERING
    • FIRESTOPPING AND AIR SEALING
    • SECOND FIX CARPENTRY
    • ALL FLOOR COVERINGS
    • RAISED ACCESS FLOORING
  • CASE STUDIES
    • BOW SQUARE
    • OAKLEY HALL
    • PORTSEBURY SEN SCHOOL
    • THE BROOK CLUB
    • SPLASHPOINT LEISURE CENTRE
    • FOREST EDUCATION CENTRE
    • SANDPIPER WALK
    • BISHOPS OTTER CAMPUS
    • HINCHLEY WOOD SCHOOL
    • CEMAST
    • SCHOLARS GRANGE
    • SILVER SANDS COURT
    • BROADSWORD HEAD OFFICE
    • CONFIDENTIAL DATA CENTRE
    • BULMERSHE SCHOOL
  • GET IN TOUCH
  • Menu

Posts

Heat Pump

Worlds First Bi-Valiant Heat Pump Ready Radiator

July 17, 2023/0 Comments/in Commercial, News /by joannevickers

ThermAssured is the worlds first bi-vailant ‘dual fuel’ radiant panel heater that combines a wet and electric heating technology into a single emitter.

The UK lags behind the rest of Europe in the installation of heat pumps; especially on retro fit projects. This is mainly because the UK has the oldest housing stock in Europe (>30% built before 1944) and that there is always a concern that older proerties cannot be insulated well enough to be warmed properly by a heat pump.

As a result, heat pump installs are stagnating, and there is a growing number of press articles featuring disatisfied customers who are cold during the worst days of Winter.

ThermAssured provides for an additional heating element in the form of a fire-safe cable that can be activated when, and only when the room fails to reach the target tempertaure in a pre-detremined time scale.

This means that for 95% of the heating season, the heat pump does the ‘heavy lifting’ warming the house using renewable energy as intended. However, after a pre-deterimned time (usually 30 minutes for care homes and assisted living, and 60 minutes in regular residential) if the room has still not reached the target temperature, the back up electric fire safe element kicks in to ‘boost’ the temperature.

Once achieved, both systems can be switched off until the room calls for heat, in which case the process starts all over again.

This means that the eletcric heating is never on when the room is being heated correctly, but is there in the event of a bitter cold snap providing occupants with peace of mind that they wont be cold.

The electrical back up heating can be installed in the most important rooms only (such as main living room and the main bedroom) and not in any others if required.

The heatingt element is also available as an ‘upgrade option’ should the ThermAssured system be installed as a ‘wet’ system only to begin with.

It is therefore now possible for developers and housing providers to have more confidence using renewables, by installing a single heating emitter that can operate on a heat pump, with solar PV back up or mains electric providing an insurance against complaints of underheating.

Manufactured in the UK, THermAssured is launched at Construction Week 2023.

 

 

https://broadsword-group.co.uk/wp-content/uploads/2023/07/Heat-Pump.jpg 866 2060 joannevickers https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png joannevickers2023-07-17 10:06:462023-07-17 10:06:46Worlds First Bi-Valiant Heat Pump Ready Radiator

Recent Posts

  • The Future of Prefabrication in Construction
  • Understanding Building Regulations in the UK: What You Need to Know
  • 3D Printing in Construction: Revolutionising the Industry
  • Sustainable Fire Protection: Eco-Friendly Solutions for Green Buildings
  • How Technology is Shaping the Future of Construction

Recent Comments

    Archives

    • June 2025
    • May 2025
    • April 2025
    • March 2025
    • February 2025
    • January 2025
    • December 2024
    • November 2024
    • October 2024
    • September 2024
    • August 2024
    • July 2024
    • June 2024
    • May 2024
    • April 2024
    • March 2024
    • February 2024
    • January 2024
    • December 2023
    • November 2023
    • October 2023
    • September 2023
    • August 2023
    • July 2023
    • May 2023
    • April 2023
    • March 2023
    • February 2023
    • January 2023
    • December 2022
    • November 2022
    • October 2022
    • September 2022
    • August 2022
    • July 2022
    • June 2022
    • May 2022
    • April 2022
    • March 2022
    • February 2022
    • January 2022
    • December 2021
    • November 2021
    • October 2021
    • September 2021
    • August 2021
    • July 2021
    • June 2021
    • May 2021
    • April 2021
    • March 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • July 2020
    • June 2020
    • May 2020
    • April 2020
    • March 2020
    • February 2020
    • January 2020
    • December 2019
    • October 2019
    • September 2019
    • August 2019
    • July 2019
    • June 2019
    • May 2019
    • April 2019
    • March 2019
    • February 2019
    • January 2019
    • December 2018
    • November 2018
    • October 2018
    • September 2018
    • August 2018
    • July 2018
    • June 2018
    • May 2018
    • April 2018
    • March 2018
    • February 2018
    • January 2018
    • December 2017
    • November 2017
    • October 2017
    • September 2017
    • August 2017
    • July 2017
    • June 2017
    • May 2017
    • April 2017
    • June 2016
    • April 2016
    • March 2016

    Categories

    • Accreditation
    • Charity Events
    • Commercial
    • Fire Protection
    • Home Page news feed
    • Interiors Fit Outs
    • News
    • Other
    • Projects
    • Residential
    • Screeding
    • technology
    • Vacancies

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org
    02380 675888
    hello@broadsword-group.co.uk
    SEE WHAT WE CAN DO FOR YOUR BUSINESS
    • prefabricationThe Future of Prefabrication in ConstructionJune 16, 2025 - 10:15 pm

      Prefabrication is transforming the construction industry by offering a faster, more efficient, and cost-effective way to build. As technology advances and the demand for sustainable building practices grows, prefabrication is poised to play an even more significant role in the future of construction. This post explores the potential and evolving trends in prefabrication. Benefits of […]

      READ MORE
    • regulationsUnderstanding Building Regulations in the UK: What You Need to KnowMay 6, 2025 - 10:12 pm

      Understanding Building Regulations in the UK: What You Need to Know Whether you’re planning a loft conversion, building an extension, or starting a full new build in the UK, understanding building regulations is absolutely essential. It’s not just about ticking boxes—it’s about making sure your project is safe, energy-efficient, and legally compliant. What Are Building […]

      READ MORE

    © Broadsword Group Ltd 2024 – website by Zap Terms of Service | Privacy Policy | Sitemap |

    logo strip
    Scroll to top