• Link to X
  • Link to LinkedIn
  • Link to Facebook
  • ABOUT US
  • WORK FOR US
  • HSEQ
  • NEWS
Tel: 02380 675888 | Email: hello@broadsword-group.co.uk
Broadsword Group
  • PROJECTS
  • RESIDENTIAL
  • SCREEDING
  • INTERIOR FIT OUT
  • FIRE PROTECTION
  • OTHER SERVICES
    • DRY LINING
    • SUSPENDED CEILINGS
    • SOLID PARTITIONING
    • RENDERING
    • SECONDARY FRAMING SYSTEM
    • ACOUSTIC SOLUTIONS
    • GLAZED PARTITIONING
    • PLASTERING
    • FIRESTOPPING AND AIR SEALING
    • SECOND FIX CARPENTRY
    • ALL FLOOR COVERINGS
    • RAISED ACCESS FLOORING
  • CASE STUDIES
    • BOW SQUARE
    • OAKLEY HALL
    • PORTSEBURY SEN SCHOOL
    • THE BROOK CLUB
    • SPLASHPOINT LEISURE CENTRE
    • FOREST EDUCATION CENTRE
    • SANDPIPER WALK
    • BISHOPS OTTER CAMPUS
    • HINCHLEY WOOD SCHOOL
    • CEMAST
    • SCHOLARS GRANGE
    • SILVER SANDS COURT
    • BROADSWORD HEAD OFFICE
    • CONFIDENTIAL DATA CENTRE
    • BULMERSHE SCHOOL
  • GET IN TOUCH
  • Menu Menu

Tag Archive for: thermal

How to Plan a Residential Refurbishment: Steps and Tips

October 8, 2025/in Fire Protection, Home Page news feed, News, Residential

Taking on a residential refurbishment is exciting, but it can also feel overwhelming if you don’t know where to start. Whether you’re updating a single room or undertaking a full home renovation, good planning is key to ensuring your project runs smoothly, stays on budget, and delivers the result you’re hoping for.

In this post, we’ve broken down the essential steps and tips for planning a successful refurbishment.

Step 1: Define Your Goals

Before any work begins, it’s important to be clear on what you want to achieve. Are you modernising a dated property, improving energy efficiency, or creating more space for family living? Having clear objectives helps guide your design choices and prevents scope creep once the work is under way.

Step 2: Set a Realistic Budget

Refurbishment costs can escalate quickly if they aren’t carefully managed. Be sure to factor in not just construction and labour costs, but also finishes, fixtures, and a contingency allowance for unexpected issues. A well-planned budget avoids nasty surprises later down the line.

Step 3: Understand Regulations and Permissions

Depending on the scale of the work, you may need planning permission or approval under UK Building Regulations. This is particularly important if you’re altering the structure, adding extensions, or changing the use of a property. Always check with your local authority before work starts to avoid costly delays.

For example, fire protection and sound insulation are common requirements in multi-residential refurbishments. At Broadsword, we deliver compliant residential refurbishment and fire protection services that meet these standards.

Step 4: Choose the Right Team

A successful refurbishment relies on experienced professionals who understand the technical, regulatory, and design aspects of residential projects. From architects and designers to specialist contractors, choosing a skilled team will ensure the work is carried out safely, legally, and to a high standard.

Step 5: Plan for Disruption

Refurbishments often involve dust, noise, and temporary disruption to your home life. Make arrangements for alternative accommodation if necessary, particularly for major works like screeding or extensive fit-outs. Even small projects benefit from having a clear plan to minimise disruption.

Step 6: Don’t Overlook Fire and Safety Measures

It’s easy to get caught up in choosing new kitchens or flooring, but fire safety, compartmentation, and proper ventilation are just as important. Investing in fire protection and compliant installations protects your property and your family for the long term.

Step 7: Keep Communication Open

Regular updates with your contractor or project manager are essential. A simple weekly meeting or call can help spot issues early, adjust timelines, and keep everyone aligned with your goals and budget.

Tips for Success

  • Prioritise quality over shortcuts – it may cost more upfront, but it pays off in longevity.

  • Think about resale value – design choices should balance personal taste with broad appeal.

  • Consider sustainability – eco-friendly materials and energy-efficient systems can reduce running costs and increase value.

Final Thoughts

A residential refurbishment is an opportunity to completely transform a property and tailor it to your lifestyle. By taking the time to plan carefully, assemble the right team, and stay on top of compliance, you can ensure the process is smooth and the results are worth the investment.

At Broadsword, we specialise in residential refurbishments that combine design vision with technical expertise. To explore how we can support your next project, visit our Residential services page or contact us to arrange a consultation with one of our experts.

https://broadsword-group.co.uk/wp-content/uploads/2025/10/How-to-Plan-a-Residential-Refurbishment_Steps-and-Tips.jpg 866 2060 Luke Mostran https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png Luke Mostran2025-10-08 09:00:432025-10-08 10:48:07How to Plan a Residential Refurbishment: Steps and Tips

Top 7 Fire Protection Mistakes to Avoid in Commercial Buildings

September 14, 2025/in Fire Protection, Home Page news feed, News

Fire protection is one of the most important elements of any commercial building, yet it’s also an area where mistakes are still all too common. While some issues may seem minor, they can undermine safety, leave a building non-compliant, and even put lives at risk. For developers, building owners, and contractors, understanding these common pitfalls is essential to ensure projects are both safe and compliant from day one.

This article explores seven of the most frequent fire protection mistakes seen in commercial buildings—and how to avoid them.

1. Blocked Fire Exits

One of the simplest yet most common issues is blocked fire exits. It’s not unusual to find exits obstructed by deliveries, furniture, or storage, but this can cause serious delays in an emergency. Fire exits should always remain fully clear and accessible at all times.

2. Fire Doors Left Open

A fire door only works if it’s closed. Too often they are wedged open for convenience, but this undermines their ability to stop the spread of smoke and fire. Regular checks and staff awareness are vital to ensure fire doors perform their role when needed.

3. Incorrect Fire-Stopping Materials

Fire stopping is critical around pipes, ducts, and cables that pass through walls and floors. Using uncertified foams or fillers instead of proper fire-rated materials is a common mistake that can fail inspections and, more importantly, compromise safety.

4. Lack of Fire Alarm Maintenance

Even the best-designed fire alarm system is useless if it isn’t regularly tested. Alarm systems require routine maintenance and inspection to meet legal requirements and provide peace of mind that they will operate correctly in an emergency.

5. Poor Compartmentation

Compartmentation is the principle of dividing a building into sections to slow down the spread of fire. Gaps left during installation or poorly fitted partitions can allow flames and smoke to spread quickly, reducing evacuation times and increasing risks. For more information on our fire protection services click here.

6. Outdated Fire Risk Assessments

A fire risk assessment is not a one-off task. As regulations evolve and the use of a building changes, assessments need updating. An outdated report will not provide adequate protection or meet compliance standards.

7. Inadequate Staff Training

Even with the most advanced fire protection systems, staff need to know what to do. Without regular training and fire drills, human error can undo even the best safety measures. Everyone in the building should understand the procedures for evacuation and emergency response.

Final Thoughts

Avoiding these mistakes doesn’t have to be complicated, but it does require diligence, regular checks, and the right expertise. By getting fire protection right from the start, you can ensure compliance, safeguard occupants, and provide reassurance for years to come.

If you would like to discuss please contact us to arrange a consultation with one of our experts.

https://broadsword-group.co.uk/wp-content/uploads/2025/08/Top-7-Fire-Protection-Mistakes-to-Avoid-in-Commercial-Buildings.jpg 866 2060 Luke Mostran https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png Luke Mostran2025-09-14 15:21:392025-10-01 16:46:37Top 7 Fire Protection Mistakes to Avoid in Commercial Buildings

The Advantages of Liquid Screed in Modern Construction

August 21, 2025/in Home Page news feed, News, Screeding

Screeding is a critical part of any build, forming the base for flooring and ensuring a smooth, level surface. In recent years, liquid screed has become increasingly popular across UK construction projects, replacing traditional sand and cement screeds in many cases. The reasons are clear: it’s faster, more efficient, and better suited to modern building techniques.

This article explores the advantages of liquid screed, its applications, and why it has become a preferred choice for contractors and developers alike.

Speed and Efficiency

One of the most significant benefits of liquid screed is how quickly it can be applied. Thanks to its free-flowing consistency, it can be pumped into place and cover large areas in a single day. This not only saves valuable time but also reduces labour costs, which is a huge advantage for projects under pressure to meet tight deadlines.

Perfect for Underfloor Heating

With underfloor heating becoming more common in both residential and commercial developments, liquid screed has emerged as the ideal partner. It flows completely around the heating pipes, removing air gaps and ensuring even heat distribution. The result is a system that’s more efficient and cost-effective to run. explore our screeding services for more information.

High-Quality Finish

Because it self-levels, liquid screed creates an exceptionally smooth and consistent surface. This eliminates the need for extensive levelling work later on and provides a reliable base for all types of floor coverings, from tiles to timber and carpet.

Faster Drying Times

Certain formulations of liquid screed can be walked on within 24–48 hours, with floor finishes laid in just a few days. This allows follow-on trades to return to site sooner and helps to keep the overall project programme moving forward without delays.

A Sustainable Option

Sustainability is a growing priority in the construction sector, and liquid screed supports this shift. Many products incorporate recycled content and produce less waste compared to traditional screeds, making them a more environmentally responsible choice.

Considerations and Best Practice

While liquid screed offers many benefits, it does require the right preparation and expertise. Surfaces need to be properly sealed before pouring to prevent leaks, and specialist pumping equipment is required. Working with experienced contractors is key to getting the best results.

A Sustainable Option

Sustainability is a growing priority in the construction sector, and liquid screed supports this shift. Many products incorporate recycled content and produce less waste compared to traditional screeds, making them a more environmentally responsible choice.

Future Outlook

As the demand for speed, efficiency, and sustainability increases, liquid screed is likely to play an even greater role in the future of construction. With ongoing innovation in mix design and drying technologies, it is set to remain a reliable, high-performance option for years to come.

Final Thoughts

Liquid screed has transformed what was once a slow, labour-intensive process into something faster, cleaner, and more efficient. For developers, contractors, and clients alike, it offers a modern solution that delivers both quality and sustainability.

If you would like to discuss please contact us to arrange a consultation with one of our experts.

https://broadsword-group.co.uk/wp-content/uploads/2025/08/The-Advantages-of-Liquid-Screed-in-Modern-Construction.jpg 866 2060 Luke Mostran https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png Luke Mostran2025-08-21 15:24:302025-10-01 16:46:20The Advantages of Liquid Screed in Modern Construction
Heat Pump

Worlds First Bi-Valiant Heat Pump Ready Radiator

July 17, 2023/in Commercial, News

ThermAssured is the worlds first bi-vailant ‘dual fuel’ radiant panel heater that combines a wet and electric heating technology into a single emitter.

The UK lags behind the rest of Europe in the installation of heat pumps; especially on retro fit projects. This is mainly because the UK has the oldest housing stock in Europe (>30% built before 1944) and that there is always a concern that older proerties cannot be insulated well enough to be warmed properly by a heat pump.

As a result, heat pump installs are stagnating, and there is a growing number of press articles featuring disatisfied customers who are cold during the worst days of Winter.

ThermAssured provides for an additional heating element in the form of a fire-safe cable that can be activated when, and only when the room fails to reach the target tempertaure in a pre-detremined time scale.

This means that for 95% of the heating season, the heat pump does the ‘heavy lifting’ warming the house using renewable energy as intended. However, after a pre-deterimned time (usually 30 minutes for care homes and assisted living, and 60 minutes in regular residential) if the room has still not reached the target temperature, the back up electric fire safe element kicks in to ‘boost’ the temperature.

Once achieved, both systems can be switched off until the room calls for heat, in which case the process starts all over again.

This means that the eletcric heating is never on when the room is being heated correctly, but is there in the event of a bitter cold snap providing occupants with peace of mind that they wont be cold.

The electrical back up heating can be installed in the most important rooms only (such as main living room and the main bedroom) and not in any others if required.

The heatingt element is also available as an ‘upgrade option’ should the ThermAssured system be installed as a ‘wet’ system only to begin with.

It is therefore now possible for developers and housing providers to have more confidence using renewables, by installing a single heating emitter that can operate on a heat pump, with solar PV back up or mains electric providing an insurance against complaints of underheating.

Manufactured in the UK, THermAssured is launched at Construction Week 2023.

 

 

https://broadsword-group.co.uk/wp-content/uploads/2023/07/Heat-Pump.jpg 866 2060 joannevickers https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png joannevickers2023-07-17 10:06:462023-07-17 10:06:46Worlds First Bi-Valiant Heat Pump Ready Radiator
Rockwool

The latest stone wool insulation from ROCKWOOL

October 31, 2022/in Home Page news feed, Interiors Fit Outs, News

We are reaching a stage globally where we are going to have to think ahead to create the next generation of insulation products.

NyRock technology is an evolution in stone wool composition that gives the most thermally efficient stone wool insulation currently available in the UK. Made using a new patented production process, products with NyRock technology have a more efficient fibre structure that can deliver thermal conductivity as low as 0.032 W/mK.

With NyRock technology and specifically NyRock Cavity Slab 032, a stone wool slab is BBA certified for both full and partial fill masonry cavity walls, offer a new low level of thermal performance for stone wool alongside a wide range of additional benefits.

Space is a critical commodity, therefore an important commercial benefit for the housing sector is NyRock Cavity Slab 032’s capacity for thinner wall construction. With a 13% improvement in thermal performance over the existing/standard stone wool cavity slab, NyRock Cavity Slab 032 can achieve the target performance of 0.18 W/m²K with a thickness of 150mm, depending on construction type, which is 25mm thinner than typical stone wool cavity products within the same wall build up.

NyRock Cavity Slab 032, like all Rockwool stone wool insulation, is also built for longevity with independent tests showing that the product is durable, rot proof and sufficiently stable to remain effective as insulation for the life of the building and because the product has a high density semi rigid composition, it will not slump in the cavity.

Further, NyRock Cavity Slab 032 comes in 455mm widths to suit standard vertical wall tie spaces and achieves a closely knitted joint with adjacent slabs, without the need for taping of the joints. This helps eliminate gaps allowing for continuity of insulation across the cavity. Stone wool’s high pliability also negates the need for impractical levels of precision cutting on-site, minimising the margin for error and the likelihood of thermal bridging.

While thermal capabilities continue to dominate insulation choice, there is growing recognition of wider factors, particularly around fire resistance following the ban on combustible materials in relevant buildings above 18 metres and 11 metres in Scotland.  With the ability to withstand temperatures in excess of 1000°C and achieving the highest Euroclass A1 non-combustible reaction to fire classification, NyRock Cavity Slab 032 gives purchasers added reassurance and developers a marketable benefit. Similarly, stone wool provides acoustic performance due to a non-directional fibre orientation and increased density that traps sound waves and dampens vibrations, significantly reducing outside sources of noise when used in an external wall.

According to their website Rockwool have developed the next great innovation in stone wool insulation through a patented production process, and NyRock®. technology is the lowest lambda stone wool insulation in the UK.

NyRock technology delivers:

Lower lambda for thinner walls
Highest thermal performance currently available from a stone wool product
Non-combustibility
All the key benefits of the strengths of stone

However, there is one disadvantage. Rockwool it is not biodegradable and can be slightly more expensive than similar insulating materials like fiberglass and cellulose. However, with it being one of the most common insulating materials being used in the USA and Canada it its use of recyclable materials means that it is gaining in popularity.  As with all types of building materials there are pros and cons, but finding materials that are made in a more sustainable way will always catch the attention.  We now need to work towards these kinds of materials also being biodegradable.

Sources: Building.co.uk / rock wool.com

https://broadsword-group.co.uk/wp-content/uploads/2022/11/Rockwool-11.22.jpg 433 1030 joannevickers https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png joannevickers2022-10-31 14:16:022022-11-07 14:16:44The latest stone wool insulation from ROCKWOOL
Thermal Insulation

Possible new thermal insulation

September 14, 2022/in Home Page news feed, Interiors Fit Outs, News

Manufactured in Latvia, it is an alternative way of recycling waste paper and hemp fibre into an innovative heat insulation material with improved thermal conductivity. The new insulation mats are designed to be easy-to-install, structurally sound and with thermal insulation properties comparable to those of mineral wool.

Other advantages will include breathability, recyclability and health safety benefits. The product will be manufactured at about one-third of the cost of pure natural fibre material. It will be displayed in retail building material stores making it widely accessible to individual homeowners.

The primary objective is to promote the amount of recycled waste paper and waste paper sorting activities in the region by developing a prototype of technology for producing the soft insulation panels and developing the optimal recipe for the thermal insulation layers (density, composition, thermal conductivity, air and sound permeability). A huge amount of waste paper arising from household waste is buried at landfills or burned, despite the fact that waste paper is recycled relatively well (on average approx. 70% in Europe).

The expected results are:

A stable production process capable of manufacturing 250 cubic metres per day of paper-hemp building insulation mats (batts), which can supply 7% of the estimated market of mineral wool insulation in Latvia;

An expected lifetime of at least 10 years for the pilot plant, which will manufacture different blended insulation materials, develop and test new combinations and mixes and provide demonstration material for different markets and applications; 3) All required certification and eco-labelling for demonstration and sale of the insulation

All required certification and eco-labelling for demonstration and sale of the insulation mats in Latvia and three key markets – UK, Germany, and Finland. The news mats will be installed in demonstration buildings in all four countries;

Draft green procurement specifications and technical information on the design, installation, use and end-of-life disposal of the paper-hemp insulation mats for each of the four target markets;

Manufacturing process and new product presented to at least 50 organisations in Europe, including potential technology entrepreneurs, manufacturers of loose paper or hemp insulation, paper collectors and recyclers, and professional associations of civil engineers and architects.

The benefits:

  • Reducing greenhouse gas emissions;
  • Reducing the use of hazardous substances;
  • Waste management promotion;
  • Energy saving;
  • Circular economy promotion;
  • Increasing employment

As yet there has been no certification of the product, but it is good to see more new and sustainable building materials coming to the market.

To find out more please visit the website

https://broadsword-group.co.uk/wp-content/uploads/2022/09/BS_Blog_header_1030x433-thermal-insulation-scaled.jpg 1077 2560 joannevickers https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png joannevickers2022-09-14 12:30:112022-10-10 11:48:37Possible new thermal insulation
Search Search

Recent Posts

  • How to Plan a Residential Refurbishment: Steps and Tips
  • Top 7 Fire Protection Mistakes to Avoid in Commercial Buildings
  • The Advantages of Liquid Screed in Modern Construction
  • Top 10 Trends Shaping Office Fit-Outs in 2025
  • The Future of Prefabrication in Construction

Recent Comments

    Archives

    • October 2025
    • September 2025
    • August 2025
    • July 2025
    • June 2025
    • May 2025
    • April 2025
    • March 2025
    • February 2025
    • January 2025
    • December 2024
    • November 2024
    • October 2024
    • September 2024
    • August 2024
    • July 2024
    • June 2024
    • May 2024
    • April 2024
    • March 2024
    • February 2024
    • January 2024
    • December 2023
    • November 2023
    • October 2023
    • September 2023
    • August 2023
    • July 2023
    • May 2023
    • April 2023
    • March 2023
    • February 2023
    • January 2023
    • December 2022
    • November 2022
    • October 2022
    • September 2022
    • August 2022
    • July 2022
    • June 2022
    • May 2022
    • April 2022
    • March 2022
    • February 2022
    • January 2022
    • December 2021
    • November 2021
    • October 2021
    • September 2021
    • August 2021
    • July 2021
    • June 2021
    • May 2021
    • April 2021
    • March 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • July 2020
    • June 2020
    • May 2020
    • April 2020
    • March 2020
    • February 2020
    • January 2020
    • December 2019
    • October 2019
    • September 2019
    • August 2019
    • July 2019
    • June 2019
    • May 2019
    • April 2019
    • March 2019
    • February 2019
    • January 2019
    • December 2018
    • November 2018
    • October 2018
    • September 2018
    • August 2018
    • July 2018
    • June 2018
    • May 2018
    • April 2018
    • March 2018
    • February 2018
    • January 2018
    • December 2017
    • November 2017
    • October 2017
    • September 2017
    • August 2017
    • July 2017
    • June 2017
    • May 2017
    • April 2017
    • June 2016
    • April 2016
    • March 2016

    Categories

    • Accreditation
    • Charity Events
    • Commercial
    • Fire Protection
    • Home Page news feed
    • Interiors Fit Outs
    • News
    • Other
    • Projects
    • Residential
    • Screeding
    • technology
    • Vacancies

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org
    02380 675888
    hello@broadsword-group.co.uk
    SEE WHAT WE CAN DO FOR YOUR BUSINESS
    • How to Plan a Residential Refurbishment: Steps and TipsOctober 8, 2025 - 9:00 am

      Taking on a residential refurbishment is exciting, but it can also feel overwhelming if you don’t know where to start. Whether you’re updating a single room or undertaking a full home renovation, good planning is key to ensuring your project runs smoothly, stays on budget, and delivers the result you’re hoping for. In this post, […]

    • Top 7 Fire Protection Mistakes to Avoid in Commercial BuildingsSeptember 14, 2025 - 3:21 pm

      Fire protection is one of the most important elements of any commercial building, yet it’s also an area where mistakes are still all too common. While some issues may seem minor, they can undermine safety, leave a building non-compliant, and even put lives at risk. For developers, building owners, and contractors, understanding these common pitfalls […]

    © Broadsword Group Ltd 2024 – website by Zap Terms of Service | Privacy Policy | Sitemap |

    logo strip
    Scroll to top Scroll to top Scroll to top