• Twitter
  • LinkedIn
  • Facebook
  • ABOUT US
  • WORK FOR US
  • HSEQ
  • NEWS
Tel: 02380 675888 | Email: hello@broadsword-group.co.uk
Broadsword Group
  • PROJECTS
  • RESIDENTIAL
  • SCREEDING
  • INTERIOR FIT OUT
  • FIRE PROTECTION
  • OTHER SERVICES
    • DRY LINING
    • SUSPENDED CEILINGS
    • SOLID PARTITIONING
    • RENDERING
    • SECONDARY FRAMING SYSTEM
    • ACOUSTIC SOLUTIONS
    • GLAZED PARTITIONING
    • PLASTERING
    • FIRESTOPPING AND AIR SEALING
    • SECOND FIX CARPENTRY
    • ALL FLOOR COVERINGS
    • RAISED ACCESS FLOORING
  • CASE STUDIES
    • BOW SQUARE
    • OAKLEY HALL
    • PORTSEBURY SEN SCHOOL
    • THE BROOK CLUB
    • SPLASHPOINT LEISURE CENTRE
    • FOREST EDUCATION CENTRE
    • SANDPIPER WALK
    • BISHOPS OTTER CAMPUS
    • HINCHLEY WOOD SCHOOL
    • CEMAST
    • SCHOLARS GRANGE
    • SILVER SANDS COURT
    • BROADSWORD HEAD OFFICE
    • CONFIDENTIAL DATA CENTRE
    • BULMERSHE SCHOOL
  • GET IN TOUCH
  • Menu

Posts

HMRC VAT

Construction wins one-year delay to reverse charge VAT

September 11, 2019/0 Comments/in News /by joannevickers

The government has agreed to delay the implementation of domestic reverse charge VAT for construction services by a year, until October 2020.

The move follows intense lobbying by the construction industry, which had warned that companies were not ready for what will be a significant change to the management of their business finances as the necessary information had not filtered through in time.

Last month a coalition of construction associations wrote to the chancellor of the exchequer asking for a six-month delay to the planned 1st October 2019 introduction of reverse charge VAT. They warned that customers paying VAT directly to HM Revenue & Customs instead of to the service supplier would have a disruptive impact on contractors’ cashflow, for which they needed to prepare.

It also coincided with the disruption of Brexit, and no one knowing what is going on there or what preparations might be required.

The chancellor has now given an additional 12 months for the construction industry to prepare – double what was asked for.

In a briefing note, HM Revenue & Customs said: “Industry representatives have raised concerns that some businesses in the construction sector are not ready to implement the VAT domestic reverse charge for building and construction on 1st October 2019.

“To help these businesses and give them more time to prepare, the introduction of the reverse charge has been delayed for a period of 12 months until 1st October 2020. This will also avoid the changes coinciding with Brexit.

“HMRC remains committed to the introduction of the reverse charge and has already increased compliance resource. It has put in place a robust compliance strategy for tackling fraud in the construction sector using tried and tested compliance tools.

“In the intervening year, HMRC will focus additional resource on identifying and tackling existing perpetrators of the fraud. It will also work closely with the sector to raise awareness and provide additional guidance and support to make sure all businesses will be ready for the new implementation date.

“HRMC recognises that some businesses will have already changed their invoices to meet the needs of the reverse charge and cannot easily change them back in time. Where genuine errors have occurred, HMRC will take into account the fact that the implementation date has changed.

“Some businesses may have opted for monthly VAT returns ahead of the 1 October 2019 implementation date which they can reverse by using the appropriate stagger option on the HMRC website.”

The news has received a warm welcome from industry associations.

Federation of Master Builders chief executive Brian Berry, who took a leading role in the lobbying campaign, said: “I’m pleased that the government has made this sensible and pragmatic decision to delay reverse charge VAT until a time when it will have less of a negative impact on the tens of thousands of construction companies across the UK. To plough on with the October 2019 implementation could have been disastrous given that the changes were due to be made just before the UK is expected to leave the EU, quite possibly on ‘no-deal’ terms. The situation hasn’t been helped by the poor communication and guidance produced by HMRC. Despite the best efforts of construction trade associations to communicate the changes to their members, it’s concerning that so few employers have even heard of reverse charge VAT. Indeed, according to research by the FMB published in July, more than two-thirds had not heard of the VAT changes and of those who had, around the same number hadn’t prepared.”

The Building Engineering Services Association (BESA) was another signatory to the letter sent last month to chancellor Sajid Javid seeking an extension.

BESA chief executive David Frise said: “This is a big win for our members. Thanks to the concerted advocacy efforts of the FMB, BESA, and other trade bodies, common sense has prevailed. If the government had not delayed the changes, many SMEs would have been caught off guard, facing increased burden and restricted cash flows while simultaneously bracing for the serious disruptions caused by the UK’s planned withdrawal from the European Union on 31st October.

“This gives us plenty of time to help businesses plan a smooth transition in the way VAT is charged by October 2020.”

The National Federation of Builders (NFB) was another signatory to the letter. Its chief executive, Richard Beresford, said: “Contractors and subcontractors weren’t ready for reverse charge VAT and we are delighted that the government has listened to our industry campaign to seek a delay.”

The FMB’s Brian Berry concluded: “It is reassuring that the government has listened to the construction industry, which has come together to make clear to the government that sticking to the October 2019 timetable could lead to a loss of productivity, reduced cashflow and in the worst cases, lead to a hit on jobs, tipping some companies over the edge. What’s required now is for the government and industry to work together to deliver a sector-wide communications campaign, which must include plain English guidance on the changes. We also want to work with the government to deliver workshops aimed at construction employers, held in locations across the country, to explain what’s happening and why.”

Source: Construction News

https://broadsword-group.co.uk/wp-content/uploads/2019/10/rsz_uc2m3eawabdjqi3iy0az.jpg 433 1030 joannevickers https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png joannevickers2019-09-11 11:11:002019-10-14 11:24:22Construction wins one-year delay to reverse charge VAT

Recent Posts

  • 3D Printing in Construction: Revolutionising the Industry
  • Sustainable Fire Protection: Eco-Friendly Solutions for Green Buildings
  • How Technology is Shaping the Future of Construction
  • Top Fire Protection Trends in Commercial Construction for 2025
  • Emerging Trends in Construction 2025

Recent Comments

    Archives

    • April 2025
    • March 2025
    • February 2025
    • January 2025
    • December 2024
    • November 2024
    • October 2024
    • September 2024
    • August 2024
    • July 2024
    • June 2024
    • May 2024
    • April 2024
    • March 2024
    • February 2024
    • January 2024
    • December 2023
    • November 2023
    • October 2023
    • September 2023
    • August 2023
    • July 2023
    • May 2023
    • April 2023
    • March 2023
    • February 2023
    • January 2023
    • December 2022
    • November 2022
    • October 2022
    • September 2022
    • August 2022
    • July 2022
    • June 2022
    • May 2022
    • April 2022
    • March 2022
    • February 2022
    • January 2022
    • December 2021
    • November 2021
    • October 2021
    • September 2021
    • August 2021
    • July 2021
    • June 2021
    • May 2021
    • April 2021
    • March 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • July 2020
    • June 2020
    • May 2020
    • April 2020
    • March 2020
    • February 2020
    • January 2020
    • December 2019
    • October 2019
    • September 2019
    • August 2019
    • July 2019
    • June 2019
    • May 2019
    • April 2019
    • March 2019
    • February 2019
    • January 2019
    • December 2018
    • November 2018
    • October 2018
    • September 2018
    • August 2018
    • July 2018
    • June 2018
    • May 2018
    • April 2018
    • March 2018
    • February 2018
    • January 2018
    • December 2017
    • November 2017
    • October 2017
    • September 2017
    • August 2017
    • July 2017
    • June 2017
    • May 2017
    • April 2017
    • June 2016
    • April 2016
    • March 2016

    Categories

    • Accreditation
    • Charity Events
    • Commercial
    • Fire Protection
    • Home Page news feed
    • Interiors Fit Outs
    • News
    • Other
    • Projects
    • Residential
    • Screeding
    • technology
    • Vacancies

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org
    02380 675888
    hello@broadsword-group.co.uk
    SEE WHAT WE CAN DO FOR YOUR BUSINESS
    • 3d printing3D Printing in Construction: Revolutionising the IndustryApril 28, 2025 - 10:52 am

      The construction industry is on the brink of a revolution, and 3D printing is leading the charge. This groundbreaking technology is transforming how structures are designed, built, and even maintained, offering unprecedented opportunities for innovation and efficiency. Here’s how it is reshaping the construction landscape and what it means for the future of the industry. […]

      READ MORE
    • sustainable fire protectionSustainable Fire Protection: Eco-Friendly Solutions for Green BuildingsMarch 24, 2025 - 10:49 am

      In the modern era of construction, sustainability is no longer a luxury—it’s a necessity. As the push for eco-friendly and green building practices gains momentum, fire protection systems must also evolve to align with these goals. Balancing safety with sustainability is essential for creating structures that are both secure and environmentally responsible. Here’s how sustainable […]

      READ MORE

    © Broadsword Group Ltd 2024 – website by Zap Terms of Service | Privacy Policy | Sitemap |

    logo strip
    Scroll to top