• Twitter
  • LinkedIn
  • Facebook
  • ABOUT US
  • WORK FOR US
  • HSEQ
  • NEWS
Tel: 02380 675888 | Email: [email protected]
Broadsword Group
  • PROJECTS
  • RESIDENTIAL
  • SCREEDING
  • INTERIOR FIT OUT
  • FIRE PROTECTION
  • OTHER SERVICES
    • DRY LINING
    • SUSPENDED CEILINGS
    • SOLID PARTITIONING
    • RENDERING
    • SECONDARY FRAMING SYSTEM
    • ACOUSTIC SOLUTIONS
    • GLAZED PARTITIONING
    • PLASTERING
    • FIRESTOPPING AND AIR SEALING
    • SECOND FIX CARPENTRY
    • ALL FLOOR COVERINGS
    • RAISED ACCESS FLOORING
  • CASE STUDIES
    • BOW SQUARE
    • OAKLEY HALL
    • PORTSEBURY SEN SCHOOL
    • THE BROOK CLUB
    • SPLASHPOINT LEISURE CENTRE
    • FOREST EDUCATION CENTRE
    • SANDPIPER WALK
    • BISHOPS OTTER CAMPUS
    • HINCHLEY WOOD SCHOOL
    • CEMAST
    • SCHOLARS GRANGE
    • SILVER SANDS COURT
    • BROADSWORD HEAD OFFICE
    • CONFIDENTIAL DATA CENTRE
    • BULMERSHE SCHOOL
  • GET IN TOUCH
  • Menu

Posts

suspended ceiling

Types of Suspended Ceilings

July 20, 2022/0 Comments/in Home Page news feed, News /by Georgia Robertson

Suspended ceilings can be described as a secondary ceiling that is suspended from a structural floor slab above producing a space between the top of the suspended ceiling and the bottom of the floor slab.

These ceilings can be incredibly useful as valuable space can be offered for building supplies that would be exposed otherwise. Suspended ceilings can also be used to provide a platform for the installation of light fixtures, smoke detectors and CCTV systems, for example. Many materials can be used to make suspended ceilings.

Lath and plaster

Lath and plaster is a method that can be used to make suspended ceilings and is typically made of narrow strips of wood (also known as laths) that are nailed across the wall studs or ceiling joists horizontally and are then coated in plaster. Lath and plaster is a permanent, sturdy form of construction. It can however be costly.

After the introduction of plasterboard in the 1930s however, lath and plaster became a less used method.

Plasterboard

Plasterboard can also be known as drywall, and is another method used for suspended ceilings. It can be used in both commercial and residential settings and is moderately affordable and durable. It gives a flat appearance. In order to gain access to the plenum space, removable panels can be installed.

Panels or tiles

Ceiling tiles are typically lightweight and are demountable things that can be inexpensive and generally fairly straightforward to install. The most common type of ceiling tile is mineral fibre, but other materials are also available, such as fibreglass, metal, wood, plastic and others.

Free span

Free span suspended system planks sit on the margins of a perimeter trim and are similar to tiles. This system is popular in corridors as it’s simple to keep up and install.

If you have any questions regarding suspended ceilings, please get in contact.

 

https://broadsword-group.co.uk/wp-content/uploads/2022/08/BS_Blog_header_1030x433-Wood-scaled.jpg 1077 2560 Georgia Robertson https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png Georgia Robertson2022-07-20 15:24:182022-08-03 15:30:16Types of Suspended Ceilings
air sealing

Air Sealing in Buildings

June 15, 2022/0 Comments/in Fire Protection, Home Page news feed, News /by Georgia Robertson

Air sealing is an effective way to help prevent fires from spreading. Buildings with air leakage can mean that a fire can spread dangerously fast as the air fans the flames of the fire. This can also seriously effect energy efficiency.

Air leakage can occur when outside air enters the building and conditioned air leaves the building. It is not recommended to rely on air leakage for natural ventilation as this can affect moisture problems within the building’s structure which can affect the health of the occupant, as well as the durability of the building structure.

Buildings must also comply with Building Regulations L2. There can be major problems for health and safety if these regulations are not adhered to. The regulations stipulate appropriate amounts of air leakage and energy conservation for all projects in the UK.

There are many benefits to air sealing, including reducing the cost of internal cooling and heating, increasing the durability of a building, improving internal air quality, comfort of occupants and air sealing is more environmentally friendly.

There are many things that can affect a building’s air leakage, such as weather, and internal building ventilation systems. As well as increasing the spread of a fire, having air leakage can also result in cold and draughty buildings, which are not pleasant to work or live in.

Using methods of air sealing, these problems can be eliminated, and buildings can become comfortable for residents and inhabitants, as well as workers within the building. It can also prevent catastrophic fires and can provide cash savings.

Further cost can be saved when installing air sealing systems and the installation of these systems can prevent the need for further work concerning air flow within the building.

If you have any questions regarding air sealing, please get in contact.

 

https://broadsword-group.co.uk/wp-content/uploads/2022/07/BS_Blog_header_1030x433-Wood-scaled.jpg 1077 2560 Georgia Robertson https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png Georgia Robertson2022-06-15 12:28:492022-07-15 12:45:22Air Sealing in Buildings
fire safety checking

New duties under Fire Safety (England) Regulations 2022

May 24, 2022/0 Comments/in Fire Protection, Home Page news feed, News /by Georgia Robertson

When the Grenfell Tower fire happened in London in 2017, it made headline news all over the country. The fire launched an enquiry into the law regarding fire safety in buildings. In 2022, a new set of regulations were announced. These regulations will be known as The Fire Safety (England) Regulations 2022 and will implement many of the recommendations that were made in the Phase 1 report of the Grenfell Tower inquiry. The new regulations will come into effect 23rd January 2023.

In the case of high-rise residential buildings, which can be classed as a multi-occupied residential building that is at least 18 metres high or 7 plus storeys, the responsible person has to:

  • Electronically share information about the building’s external wall system to their local fire and rescue service (FRS) and they must also supply electronic copies of the floor plans and building plans.
  • Hard copies of the building’s floor plans must be kept, as well as an orientation plan of the building on a single page. The name and UK contact details of the person responsible must be kept in a secure information box, which can be accessed by firefighters.
  • Wayfinding signage must also be installed in all high-rise buildings that is visible even in low-light conditions.
  • Monthly (at minimum) checks must be carried out on lifts which are for the use of firefighters in high-rise residential buildings.

All communal fire doors must be checked quarterly in multi-occupied residential buildings that are higher than 11 metres in height. Also, annual checks must be conducted on flat entrance doors.

If these regulations aren’t followed, then there can be some severe consequences. Fines can be given, and even jail time in extreme cases of neglect to abide by the regulations. It’s very easy to think ‘that will never happen to me’ so sometimes regulations aren’t treated with the seriousness they deserve. This is why there are over 22,000 fires in the UK every year. The costs of a fire can be catastrophic.

If you have any questions regarding the new regulations, please get in contact.

 

https://broadsword-group.co.uk/wp-content/uploads/2022/06/BS_Blog_header_1030x433-Wood-scaled.jpg 1077 2560 Georgia Robertson https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png Georgia Robertson2022-05-24 14:22:012022-06-24 14:22:15New duties under Fire Safety (England) Regulations 2022
risk assessment fire safety

Construction site fire safety regulations: Who’s responsible?

April 18, 2022/0 Comments/in Fire Protection, Home Page news feed, News /by Georgia Robertson

Rules and regulations should always be followed, especially with regards to fire safety. If a law has been broken or regulations not followed, then it can mean the difference between life and death. Despite the growth in performance that the industry has had over the last decade, the risk of injury, death and ill health are still too high.

However, the risks are not just limited to construction site workers. Other members of the public that happen to be near the site can also be injured if fire safety regulations are not being followed. Fires can of course spread, and any property that is adjacent to a construction site that has a large enough fire can be damaged.

Therefore, it is incredibly important to ensure that the correct people oversee fire regulations and are held responsible for following the rules.

One of the main laws that need to be followed is the Regulatory Reform (Fire Safety) Order 2005 (FSO).

Who is responsible?

FSO requires that a ‘responsible person’ must be designated as the fire safety officer. This person is usually the principal or main contractor in charge of the site.

It is also the client or other duty holders’ responsibility to ensure that the correct information is provided before starting construction work in order to ensure that adequate provision of precautions can be developed. The owner or occupier must also supply the contractor with sufficient health and safety information so that hazards and risks can be identified so that the correct procedures can be put in place.

What are the responsibilities?

The fire safety officer will need to complete a risk assessment and ensure that it consistently kept up to date. The business or building owner will be responsible for ensuring that this assessment gets carried out. This will need to be regularly reviewed in order to ensure that the documentation is constantly up to date. You could consider bringing in an expert, such as an IFE-registered risk assessor, if a comprehensive assessment is required.

Appropriate measures will need to be taken in order to minimise any risks to safety. Sources of fuel must be identified, and precautions must be taken, such as identifying fire escapes, and warning of and fighting fires, based on the risk assessment.

Warning

A warning system must be set up in order to alert people to any fires. This can be in the form of a temporary or permanent mains fitted fire alarm that is tested regularly, a klaxon, an air horn or whistle, however, this completely depends on the size of the building site. The warning will need to be recognisable by everyone and audible above all other noise.

Means of escape

Fire safety regulations set out that safe routes must be identified so that people can leave the building safely in the event of a fire. The risk assessment should determine the fire escape routes required (which have to be kept unobscured and clear), alternative routes to ground level should be provided where possible. Protection can also be provided if the correct fire doors and permanent fire separation are installed as soon as possible. Escape routes should allow people to congregate in a safe place where people can be accounted for. Fire escape routes must also be sign posted so that people unaware of the routes can easily find them. For enclosed escape routes, lighting should also be used.

Consequences of breaking the law

The local fire and rescue authorities may visit the construction site in order to make sure that the risk assessment has been conducted, and to ensure that appropriate fire prevention measures are in place.

If they deem that the measures are inadequate, then an informal notice can be issued. The local authorities can also issue a formal notice, and will inform you of how to fix the safety issues. An alterations notice could also be issued. This could be issued if the premises have high safety concerns or will have high risks if the premises changes. If a serious risk isn’t being managed, then an enforcement notice can be issued. It will detail what improvements are needed and by when. A prohibition notice could be issued if the fire and rescue authorities deem the site unsafe and the premises must be prohibited or restricted.

You can appeal to these notices if you disagree with the notices issued. You can arrange for an informal review from the local fire and rescue authorities. Within 21 days, you can appeal to the local magistrates’ court regarding the notice.

If fire safety regulations are not met, then there can be serious consequences, and you could even go to prison or get a fine. Fines of up to £5000 can be issued for minor offenses. Major offenses can have any fine issued and up to 2 years in prison.

Conclusion

In conclusion, it is incredibly important to ensure that all fire safety regulations are being followed and that the correct people are taking the correct level of responsibility in order to prevent injury or death. The main law to be followed is the Regulatory Reform (Fire Safety) Order 2005 (FSO). It’s also important to make sure it’s being followed so that no fines or sanctions are imposed.

 

If you have any questions regarding fire safety regulations, please get in touch.

https://broadsword-group.co.uk/wp-content/uploads/2022/05/BS_Blog_header_1030x433-fire-safety-scaled.jpg 1077 2560 Georgia Robertson https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png Georgia Robertson2022-04-18 14:55:522022-05-07 16:02:52Construction site fire safety regulations: Who’s responsible?
hazardous materials

Construction sites: fire safety

March 18, 2022/0 Comments/in Fire Protection, Home Page news feed, News /by Georgia Robertson

Every year, a large number of fire incidents occur on construction sites and in buildings undergoing refurbishments. These incidents can cause many injuries or in severe cases, death. Some of these incidents can be entirely preventable. Therefore, it is extremely important that all legislation is being followed. This article will discuss steps that can be taken in order to prevent these events.

Legal requirements

The Construction (Design and Management) Regulations 2015 (CDM) document discusses duties in relation to fire safety in construction sites. Responsibility is set out in the Regulatory Reform (Fire Safety) Order 2005 (FSO) (England and Wales) document. However, you must constantly familiarise yourself with fire safety legislation on a regular basis as it constantly changes based on current events and trends.

It is down to the principal contractor to ensure that legislation is being followed for that country and also to ensure that risk assessments have been completed.

Fire hazards in construction sites

There are 2 main areas that fire hazards can be controlled, fuel sources and with respect to ignition. The risk of a fire starting can be drastically reduced if it can be controlled or the hazard can be eliminated.

Electrical faults

Electrical items can be a fire hazard whether fixed or portable and it is important to ensure that these items are properly cared for in order to minimise risk. It’s important to ensure that all electrical items are routinely tested and maintained to an appropriate standard. Portable Appliance Testing (PAT) should be carried out in accordance with the HSE guidance note HSG107 which advocates a risk-based testing policy.

Hot working

Hot works are defined as all “processes involving the generation of heat by a naked flame, electrical arc, sparks, and the use of bitumen boilers or grinding”. Unless it’s completely necessary, acetylene should not be used on site when using open flame gas cutting equipment or disc cutters.

Smoking

It may be an obvious one, but smoking can be a huge fire hazard, particularly when smoking around flammable materials on a construction site. Typically, smoking areas will be designated at a construction site in order to minimise fire risk.

Fuel sources

Flammable materials, such as fuel, should be properly contained in order to prevent fires. Management of these materials falls to the site manager and should include the whole process from procuring the correct fuel, its use and the potentially hazardous operations such as refuelling.

 

If you have any questions regarding fire safety on construction sites, please get in contact.

https://broadsword-group.co.uk/wp-content/uploads/2022/04/BS_Blog_header_1030x433-Wood-scaled.jpg 1077 2560 Georgia Robertson https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png Georgia Robertson2022-03-18 15:52:202022-04-04 16:08:50Construction sites: fire safety
Boris Johnson

Boris Johnson promises thousands of construction jobs to boost recovery

June 30, 2020/0 Comments/in Home Page news feed, News /by joannevickers

Prime minister Boris Johnson has confirmed his government’s commitment to using construction to help rebuild the economy in the wake of the coronavirus crisis.

He has pledged to fund 40 new hospitals and provide large-scale investment in roads and rail projects.

A statement from Downing Street said the government was committed to an immediate £5bn package of capital investment in infrastructure projects, although some of those specifically named – such as a £1.2bn spend on schools – had been announced before, including in the Infrastructure and Project Authority’s pipeline of planned projects two weeks ago.

Johnson said a taskforce called ‘Project Speed’ would be set up to “scythe through red tape” and get projects delivered faster and hinted at changes to procurement rules to speed up appointments.

He said: “With every flood-defending culvert that we dig, with every railway station, hospital or school that we build, we will of course be tackling the next wave of this crisis by helping to create thousands of high-paid, high-skilled jobs.

“Because we know in our hearts that the furloughing cannot go on forever, and as the economy recovers we also know that the jobs that many people had in January are also not coming back or at least not in that form; we know that is the biggest and most immediate economic challenge that we face.”

A long-awaited National Infrastructure Strategy is due to be released in the autumn, Downing Street confirmed.

Balfour Beatty chief executive Leo Quinn welcomed Johnson’s speech: “The prime minister’s commitment to accelerate the UK’s long-term infrastructure pipeline is a critical factor for the country’s recovery. As well as stimulating regional and national economies, it will generate vast employment opportunities across the country and help provide our younger generations with employable skills. Without this, following the fallout from COVID-19, we could see widespread structural unemployment issues,” he said.

But Pinsent Masons infrastructure partner Jon Hart warned that the “eye-catching” commitments lack substance. He said: “The previously announced ‘pipeline’ contains a number of anomalies in respect of projects that have already been announced.

“During such an economically turbulent time, the government needs to remove uncertainty around approaches to procurement, particularly for schools and hospitals,” he added. “It will be interesting to see how tendering processes can be sped up and how the public-sector capacity gap within government for procuring schemes, when coupled with the industry’s own skills shortage, is going to be addressed.”

Federation of Master Builders chief executive Brian Berry called for the repair and maintenance sector not to be overlooked in government investment plans, and called for a VAT cut to boost that market.

UK Green Building Council chief executive Julie Hirigoyen said there needs to be more investment in specific measures to hit net-zero carbon emissions targets by 2050. She said: “The plans announced by the PM today make no reference to energy efficiency – perhaps the most urgent of all infrastructure priorities – that can create jobs right around the country, improve health and reduce costs to NHS, and increase consumer spending power by lowering energy bills.”

Source: Construction News

https://broadsword-group.co.uk/wp-content/uploads/2020/07/rsz_16849857320_1aaa7564dc_b.jpg 433 1024 joannevickers https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png joannevickers2020-06-30 12:04:562020-07-27 12:09:49Boris Johnson promises thousands of construction jobs to boost recovery
energy performance

The energy performance of commercial buildings needs improvement

October 23, 2019/0 Comments/in Home Page news feed, News /by James

The government has published a consultation paper with proposals setting a minimum energy efficiency standard of EPC Band B by 2030 for privately rented buildings. 

Alongside this, the government promises to consult in 2020 on introducing mandatory in-use energy performance ratings for business buildings.

The move come in response to recommendations from the Committee on Climate Change (CCC) earlier this year and extensive lobbying by the UK Green Building Council (UKGBC).

UKGBC chief executive Julie Hirigoyen said: “Today’s announcement is most encouraging, as we have long called for more ambitious policies to improve the energy performance of our commercial buildings.  It is also a welcome complement to the government’s recently announced plans to strengthen energy efficiency standards for new homes – and shows that they are finally understanding the importance of tackling buildings emissions as we strive to meet our climate targets.

“By signalling a long-term Band B target for rented commercial buildings, the government is providing welcome certainty, which will help underpin businesses’ energy improvement plans and the supporting investment decisions.  As the market has already shown, minimum standards for rented buildings can have a transformative effect on their performance.

“We are also pleased to see the government at last acknowledging the importance of mandatory operational energy ratings for commercial buildings.  There is strong evidence from the Australian NABERS scheme, amongst others, that mandatory operational ratings can radically drive down energy use and reduce emissions.  The best-performing business buildings in Melbourne use between five and six times less energy than their London equivalents.”

Source: The Construction Index

https://broadsword-group.co.uk/wp-content/uploads/2019/10/rsz_1energy-performance-certificate-picture-id164628755.jpg 331 1026 James https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png James2019-10-23 14:43:192019-11-14 20:40:35The energy performance of commercial buildings needs improvement
flag

Industry backing for the government to relax its post-Brexit immigration proposals

October 16, 2019/0 Comments/in Home Page news feed, News /by James

The Construction Industry Training Board (CITB) report calls for the proposed one-year visa for ‘low-skilled’ workers to be extended to two years.

It also recommends that non-UK born workers entering the UK on a ‘low skilled’ visa be allowed to transition to a ‘high-skilled’ visa while working in the UK – train to remain.

And it proposes an ‘umbrella sponsorship’ scheme to allow self-employed non-UK workers to obtain the necessary employment sponsorship.

The CITB’s research found that 61% of migrants say they would choose to move from a ‘low’ to a ‘high’ skilled visa while continuing to work in the UK, and that 70% of employers of non-UK born construction workers see the ‘low skilled’ visa for people with level 2 qualifications as unsuitable for their businesses

The research report, Migration and Construction, finds that just 3% of construction employers have the necessary experience in handling visa applications, with two-thirds saying that the process is difficult.

Under the new post-Brexit immigration system – due to be introduced in January 2021 – employers will have to learn how to navigate the bureaucracy of visa applications for all foreign workers.

CITB policy director Steve Radley said: “Migrant workers have long played a key role in the UK’s construction sector. They make up 14% of the construction workforce, a percentage that rises to 54% in London. They give employers the flexibility to respond quickly to skills needs.

“Employers are raising real concerns about the future 12 month visa scheme. They want to see it extended to 24 months, and for workers to be given the opportunity to ‘train to remain’. A new scheme must additionally be put in place to enable self-employed migrants to work in the sector.

“It’s important that construction has the breathing space to adjust to new changes. CITB will work closely with Government to see that a simple, flexible migration system is put in place to support employers’ skills requirements, while industry grows its domestic workforce.”

Contractors have backed the recommendations

Alasdair Reisner, chief executive of the Civil Engineering Contractors Association (CECA), said: “The construction and infrastructure sectors have been facing a looming skills gap for some years, and it is deeply concerning that after the UK has left the European Union restrictions may be put in place to prevent non-UK born workers contributing to our industry.

“Currently, non-UK born workers account for 14% of UK construction’s workforce, rising to 54% in London.

“Industry is in the process of moving towards recruiting an extra 44,000 British-based people in construction by 2025 to meet projected demand.

“However for UK construction to achieve this goal while delivering the significant pipeline of projects the UK government has planned, those who currently contribute to our industry and the economic and social wellbeing of us all must be given the opportunity to continue to do so. That’s why we are calling on the government to take steps to ensure industry is ready for the post-Brexit migration landscape, by extending the period in which existing non-UK born workers are able to ‘train to remain.’

“Employers in the construction sector are actively working to grow the domestic workforce, but it will take time to do so. Unless the UK government changes its position, industry will be hamstrung in the immediate post-Brexit period, to the detriment of its ability to drive growth and deliver for the UK economy.”

Brian Berry, chief executive of the Federation of Master Builders, said: “The CITB report is absolutely right to highlight the barriers facing construction employers needing to employ non-UK workers. The government needs to look again at its post-Brexit immigration system to make it easier and simpler for small building companies needing to recruit non-UK labour. There is currently a serious skills crisis in the building industry which explains why 9% of the construction workforce is made up of EU workers. Given it takes many years to train a high-quality tradesperson there will, in the short term at least, continue be an urgent need to recruit non-UK labour. Without this labour the industry will not be able to deliver the homes and key infrastructure projects that are needed to underpin the UK’s national productivity and growth.”Mr Berry concluded: “The current non-EU migration system is exceptionally difficult for small employers to engage with taking as long as eight months in some instances to secure specialist tradespeople to come to the UK to work on sites. Most small businesses simply don’t have the time and resources to take that on. It would be very damaging just to extend this system to EU workers without seriously reforming it. Extending ‘low skilled’ visas from 12 months to 24 months; allowing non-UK born workers the opportunity to transition to a ‘high skilled’ visa; and the creation of an ‘umbrella sponsorship’ scheme would help ease concerns about how construction companies are going to fill the skills gaps.”

Souce: The Construction Index

https://broadsword-group.co.uk/wp-content/uploads/2019/09/rsz_unkg4003__33888146046109612801280__50892148068206012801280.png 331 1026 James https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png James2019-10-16 14:37:382019-11-14 14:40:06Industry backing for the government to relax its post-Brexit immigration proposals
Housing

House-building starts down 8% year-on-year

October 9, 2019/0 Comments/in Home Page news feed, News /by James

In the second quarter of 2019 new build dwelling starts in England are estimated at 37,220 units (seasonally adjusted), which is a 2% decrease compared to the first quarter and 8% down year-on-year.

New house-building starts are 24% below their peak in Q1 2007 but 117% per cent above the trough Q1 of 2009.

According to the numbers released by the Ministry of Housing, Communities & Local Government, annual new build dwelling starts totalled 160,640 in the year to 30th June 2019, a 1% decrease on the previous.

During the same period, completions reached 173,660 in the year to June, an increase of 8% on the previous year.

Secretary of state for housing Robert Jenrick preferred to focus on the rise in completions rather than the fall in starts. “The data released today is hugely welcome, with the number of new homes built reaching an 11-year high,” he said. “We are moving in the right direction, but there is still much more to do if we are going to deliver the numbers needed by communities up and down the country.”

Clive Docwra, managing director of construction consultant McBains, said: “Today’s figures show the amount of new homes being started or completed are still nowhere near the number required to meet the government’s target of building 300,000 homes a year by the mid 2020s.

“Brexit uncertainty continues to bite, with many housebuilding projects on hold until the picture on the UK withdrawal from the EU becomes clearer, while the weak pound means the high cost of imported materials is holding back construction.

“Demand for housing is far outstripping supply, but today’s figures prove there is still no light at the end of the tunnel in terms of solving the housing crisis.”

Source: The Ministry of Housing, Communities & Local Government

Source: The Construction Index

https://broadsword-group.co.uk/wp-content/uploads/2018/07/Housing-1030x433.jpg 433 1030 James https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png James2019-10-09 14:34:572019-11-14 14:40:53House-building starts down 8% year-on-year
flag

Recession fears as EU workers leave the UK

August 28, 2019/0 Comments/in News /by joannevickers

There are clear signs that the construction sector is bracing itself for a downturn.

According to the Federation of Master Builders (FMB), an independent, non-profit trade association that represents 8,000 small- to medium-sized building firms, companies are already reducing their headcount of direct employees in favour of subcontractors who are easily removed if the work dries up.

The FMB’s most recent State of Trade survey showed that employment among construction SMEs had dropped for the first time in more than five years.

“Their thinking is that if the worst happens and a recession hits later this year, they need the size of their workforce to be flexible in order for their firm to survive,” said Arthur McArdle, the FMB’s national president. “However, this strategy is not without risk, as if construction bosses are employing more subbies, they might not always be certain of their quality. Rebalancing the workforce may seem like a good idea at the time, but it could lead to reputation-damaging mistakes.”

Another body, the Home Builders Federation (HBF). meanwhile. said however that delays in the planning process and a lack of available land were of more concern at the moment to its members, who account for 80% of all new homes built in England and Wales.

Buyer confidence was cited in March as a major constraint by only 7% of members of the Home Builders Federation (HBF), well down on the 48% who said it was a challenge of a similar scale at the end of last year.

Stockpiling, which has been taking place in other sectors ahead of Brexit, is meanwhile less of an indicator in the building trade. Smaller and medium-sized companies do not have the necessary storage space in the first instance. When shortages have occurred, such as problems in relation to bricks last year, they have been rectified relatively quickly.

Results from a survey of over 10,500 construction workers carried out by recruiter Randstad has revealed that one in three EU nationals have considered leaving the UK because of the Brexit referendum.

The truth is that it’s the potential drop in construction projects, subsequent funding, and availability of jobs that’s the biggest driving force influencing the 39% who are expressing concern. This is followed by uncertainty over trade deals with the EU (19%), new findings suggest.

A no-deal Brexit raises the prospect of delays and cost increases, as employers face difficulties to get vital EU workers to UK building sites, threatening timing of projects. With 7% of construction workers in the UK and over a quarter of London’s construction workforce coming from other EU countries (ONS), plus the £10bn (15%) of building materials coming from the EU, it’s clear that action needs to be taken. The good news is that there is still time to make a difference and retain highly-skilled workers.

As the country gets closer to withdrawing from the EU, it is becoming clearer that employers and employees are sceptical of what the industry will look like later this year in terms of workforce and materials supply. Of all of those surveyed, one fifth admitted that they have considered leaving the country amid Brexit uncertainties.

 

Source: The Guardian / Showhouse.co.uk

https://broadsword-group.co.uk/wp-content/uploads/2019/09/rsz_unkg4003__33888146046109612801280__50892148068206012801280.png 331 1026 joannevickers https://broadswordgrp.wpengine.com/wp-content/uploads/2019/11/broadsword-logo.png joannevickers2019-08-28 11:08:052019-09-17 11:17:12Recession fears as EU workers leave the UK
Page 1 of 6123›»

Recent Posts

  • Types of Suspended Ceilings
  • Air Sealing in Buildings
  • New duties under Fire Safety (England) Regulations 2022
  • Construction site fire safety regulations: Who’s responsible?
  • Construction sites: fire safety

Recent Comments

    Archives

    • July 2022
    • June 2022
    • May 2022
    • April 2022
    • March 2022
    • February 2022
    • January 2022
    • December 2021
    • November 2021
    • October 2021
    • September 2021
    • August 2021
    • July 2021
    • June 2021
    • May 2021
    • April 2021
    • March 2021
    • February 2021
    • January 2021
    • December 2020
    • November 2020
    • October 2020
    • July 2020
    • June 2020
    • May 2020
    • April 2020
    • March 2020
    • February 2020
    • January 2020
    • December 2019
    • October 2019
    • September 2019
    • August 2019
    • July 2019
    • June 2019
    • May 2019
    • April 2019
    • March 2019
    • February 2019
    • January 2019
    • December 2018
    • November 2018
    • October 2018
    • September 2018
    • August 2018
    • July 2018
    • June 2018
    • May 2018
    • April 2018
    • March 2018
    • February 2018
    • January 2018
    • December 2017
    • November 2017
    • October 2017
    • September 2017
    • August 2017
    • July 2017
    • June 2017
    • May 2017
    • April 2017
    • June 2016
    • April 2016
    • March 2016

    Categories

    • Accreditation
    • Charity Events
    • Commercial
    • Fire Protection
    • Home Page news feed
    • Interiors Fit Outs
    • News
    • Other
    • Projects
    • Residential
    • Screeding
    • Vacancies

    Meta

    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org
    02380 675888
    [email protected]
    SEE WHAT WE CAN DO FOR YOUR BUSINESS
    • suspended ceilingTypes of Suspended CeilingsJuly 20, 2022 - 3:24 pm

      Suspended ceilings can be described as a secondary ceiling that is suspended from a structural floor slab above producing a space between the top of the suspended ceiling and the bottom of the floor slab. These ceilings can be incredibly useful as valuable space can be offered for building supplies that would be exposed otherwise. […]

      READ MORE
    • air sealingAir Sealing in BuildingsJune 15, 2022 - 12:28 pm

      Air sealing is an effective way to help prevent fires from spreading. Buildings with air leakage can mean that a fire can spread dangerously fast as the air fans the flames of the fire. This can also seriously effect energy efficiency. Air leakage can occur when outside air enters the building and conditioned air leaves […]

      READ MORE

    © Broadsword Group Ltd 2017 – website by Zap Terms of Service | Privacy Policy | Sitemap |

    accreditation logos
    Scroll to top