Put your school
in safe hands

Put your school in safe hands

Fire risk assessment
specialists for schools

Can you keep your students safe if there was a fire? Built in fire protection is fundamental in preventing the spread of fire and smoke.  We can provide specialist guidance and assistance to make sure of compliance and safety, so that if there was a fire systems are in place.

  • Fire can spread very quickly if not compartmentalised
  • Safeguarding staff members and children is the priority
  • Vital to prevent the spread of fire and smoke
  • Total evacuation not always appropriate, moving into a protected area can be a safer approach
  • If total evacuation is needed a safe zone needs to be created to allow access and a viable escape route

GET A FREE CONSULTATION
OR BOOK A SURVEY

6 + 2 = ?

OR CALL US NOW ON: 02380 675888

OR CALL US NOW ON: 02380 675888

What is the FIRAS Accreditation?

FIRAS is a third party certification scheme that verifies the competence of a contractor company to design fire protection systems. As a participant in the scheme we employ appropriately skilled design, supervision and operational staff who have been assessed.

  • FIRAS certification is strictly controlled to cover only the trade disciplines assessed
  • All FIRAS site inspectors have technical and practical knowledge and experience in fire protection
  • Each FIRAS Certificated company is required to continue to demonstrate compliance with industry standards and material/product manufacturer installation instructions
  • Many customers know little about how fire threatens their staff or business or what their legal obligations are

Case study:
Castle Hill Primary School

The much needed extension project of Castle Hill Primary School in Basingstoke comprised of the construction of a new two story building housing 7 classrooms, a Learning Resource Centre, main hall, toilets, and a reception area. In conjunction with our established client Osborne Construction we undertook the specialist fire protection works on this £2.7m project. Our works included specialist fire protection work to all risers, 60 minute fire compartmentalisation to all communal areas plus 60 minute encasement and installation of 60m fire doors. A fully compliant Rockwool specified system was installed. This process was managed using state of the art Bolster reporting and upon completion a FIRAS compliant certification was issued to client. 2-3 FIRAS accredited operatives completed the project.

.

Case study:
Castle Hill Primary School

The much needed extension project of Castle Hill Primary School in Basingstoke comprised of the construction of a new two story building housing 7 classrooms, a Learning Resource Centre, main hall, toilets, and a reception area. In conjunction with our established client Osborne Construction we undertook the specialist fire protection works on this £2.7m project. Our works included specialist fire protection work to all risers, 60 minute fire compartmentalisation to all communal areas plus 60 minute encasement and installation of 60m fire doors. A fully compliant Rockwool specified system was installed. This process was managed using state of the art Bolster reporting and upon completion a FIRAS compliant certification was issued to client. 2-3 FIRAS accredited operatives completed the project.

Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Donec odio. Quisque volutpat mattis eros. Nullam malesuada erat ut turpis. Suspendisse urna nibh, viverra non, semper suscipit, posuere a, pede.

GET A FREE CONSULTATION
OR BOOK A SURVEY

OR CALL US NOW ON

02380 675888

4 + 0 = ?

GET A FREE CONSULTATION
OR BOOK A SURVEY

7 + 1 = ?

OR CALL US NOW ON

02380 675888